BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Napa, California. Completed plans call for site work for a water / sewer project.

Provide all labor, tools, equipment, materials, incidentals, permits and taxes necessary to remove the existing sediment fill within the well, assess the well for possible obstruction, removal of obstruction (if warranted), well video survey, and installation of cement within the well structure for destruction of the well. Location of Services: Napa Sonoma Marshes Wildlife Area Edgerly Island, Milton Road, Napa, CA 94559. Estimated Cost: $ 70,000.00 Participation in Disabled Veteran Business Enterprise Program (DVBE): The minimum DVBE participation percentage goal is 3%. Failure to fulfill the DVBE requirement will render your bid non-responsive. DVBE Incentive: For evaluation purposes only, an incentive will be given to bidders who exceed the 3% DVBE participation requirements. Refer to the Instructions to Bidders. Small Business Preference and Small Business Subcontractor participation: A five percent (5%) Small Business Preference will be granted to properly certified small businesses (a copy of your certification must be submitted with the bid proposal). As of March 1, 2015, Senate Bill 854 requires that No Contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations for projects greater than $25,000.00. Failure to register with DIR or list sub-contractors not registered will render your bid non-responsive. Contract Term Date: Upon DGS approval until June 29, 2024. For general questions pertaining to the bidding requirements, please contact Engineering at 916-539-4060. For Engineering questions, please contact Bryan Demucha at (916) 531-4716 or Email; Bryan.Demucha@wildlife.ca.gov. Construction shall be completed within THIRTY (30) WORKING DAYS following the official "Notice of Start Date" from the State to the Contractor to commence construction. Additional working days will be allowed for delays caused by unexpected changes including but not limited to supply chain or natural force. Contractor must advise Engineer IN WRITING of unexpected changes and obtain CDFW approval before any delays occur.

Bid Results

Water / Sewer

$56,030.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
90
Bidding Soon
1,819
All Active Projects
767
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2023

April 1, 2024

img_map_placeholder

1598 Milton Rd, Napa, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.