Published October 25, 2023 at 8:00 PM
Updated January 26, 2024
Renovation of a water / sewer project in Pincher Creek, Alberta. Completed plans call for the renovation of a water / sewer project.
The Town of Pincher Creek’s (the Town) Water Treatment Plant (WTP) provides drinking water to the water distribution system in the Town. Potable water is pumped to the Town’s water distribution system using two sets of vertical turbine pumps. The first set consists of two pumps operating at low head. The second set includes three pumps installed in 1992, operating at high head and that need to be replaced. The Town intends to carry out a portion of the improvement works inside the WTP. The scope for the improvement works includes the following: 1. All Permitting, Bonds, Warranties required for the project. 2. Removal of the existing three vertical turbine pumps operating at high head. 3. Supply and install new three vertical turbine pumps. 4. Removal of existing fluoride dosing pump and replace with identical pump in the same place. 5. Removal of existing two filter turbidimeters and replace with identical turbidimeters in the same place. 6. Replace the existing Pressure Relief Valve and installation of a new Pressure Transmitter on the pump station main header. 7. The electrical and controls for the new three pumps, for the fluoride dosing pump and for the turbidimeters will be installed and re-connected to the electrical and controls for the WTP building. The electrical and controls connections will be completed by the Town’s electrical contractor “Candu Automation and Control Solutions ltd”. The Contractor will be responsible for any coordination with Candu Automation and Control Solutions and will carry out the required site coordinate to complete the new electrical/programming work in parallel with the installation of the new pumps and equipment. 8. Complete all the required structural and piping work for the installation of the described works above. 9. Commissioning of the installed works under the project. Documents can be obtained from https://pinchercreek.bidsandtenders.ca/
Award
Water / Sewer
$327,394.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2023
November 1, 2023
1100 Beaver Dr, Pincher Creek, AB
Related To This Project
Pincher Creek, AB
Bid Date: Oct 28 2023
Pincher Creek, AB
--
Pincher Creek, AB
Bid Date: Feb 27 2024
Pincher Creek, AB
--
Pincher Creek, AB
Bid Date: Apr 10 2024
Pincher Creek, AB
Bid Date: Apr 19 2024
Pincher Creek, AB
Bid Date: Aug 03 2021
Pincher Creek, AB
Bid Date: Jun 30 2021
Pincher Creek, AB
Bid Date: Oct 11 2023
Pincher Creek, AB
Bid Date: Sep 30 2022
Pincher Creek, AB
Bid Date: Sep 30 2022
Pincher Creek, AB
Bid Date: Sep 06 2022
Pincher Creek, AB
Bid Date: Mar 29 2022
Pincher Creek, AB
Bid Date: Jun 07 2021
Pincher Creek, AB
Bid Date: Dec 17 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.