BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Kirkwood, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and water / sewer project.

The City of Kirkwood is requesting sealed bids for Longview Boulevard Improvements for the Citys Engineering Department , in accordance with the specifications contained herein. MSD Reference No.: 23MSD-00310 Unless otherwise stipulated, the Contractor shall provide and pay for all bonds, insurance, materials, labor, tools, equipment, light, power, water, transportation, and other facilities necessary for the execution and completion of the work. If the Contractor, in the course of the work, finds any discrepancy between the drawings and the physical conditions of the locality, or any error or omissions in the drawings or in the layout as given by points and instructions, it shall be his duty to immediately inform the Engineer in writing; and the Engineer shall promptly verify the same. Any work done after such discovery, until authorized, will be done at the Contractor's risk. The Contractor shall continuously maintain adequate protection of all his work from damage. The Contractor shall be responsible for the preservation of all public and private property. He shall make good any damage, injury, or loss. He shall adequately protect adjacent property as provided by law and the Contract. All survey monuments and property markers shall be carefully preserved in place by the Contractor who shall be responsible for the correct replacement of all such monuments and markers disturbed during the work. The Contractor shall provide for normal drainage and shall continuously maintain channels, swales, pipes, culverts, and all drainage structures in the project area. The Contractor is responsible for any damage caused by his failure to provide and maintain normal drainage. All work, materials, and methods of construction shall be subject to the inspection of the Engineer, who shall be the judge of the quality and suitability of them for all purposes for which they are used. Acceptance of any material or workmanship shall not serve to prevent subsequent rejection by the Engineer if he finds either or both to be unsatisfactory. The Engineer shall be furnished with such information and assistance by the Contractor as is required to make a complete and detailed inspection. Any work done or materials used failing to meet the approval of the Engineer shall be replaced by the Contractor at his own expense. Any work done or materials used without inspection by the Engineer may, at the option of the Engineer, be ordered removed at the Contractor's expense. Inspection by the Engineer is not for the purpose of running the job and does not relieve the Contractor of his responsibilities to meet the conditions of the plans and Contract Documents. All drainage and sewer work may be subject to the inspection of the Metropolitan St. Louis Sewer District. Their authorized representatives shall be furnished with such information and assistance by the Contractor as is required to make a complete and detailed inspection. Questions due by 5:00 PM (CT) General information and instructions to respondents are contained herein. Any Contact by Supplier in Regards to This Bid With City Personnel Other Than Those Defined Herein May Be Considered Grounds for Dismissal of Suppliers Bid. All Questions Must Be Asked Electronically

Award

Bridges / Tunnels

$844,338.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
95
Bidding Soon
1,378
All Active Projects
598
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 28, 2023

October 27, 2023

img_map_placeholder

Multiple Locations, Kirkwood, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.