BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a fire / police facility in Ewing, Missouri. Completed plans call for site work for a fire / police facility.

The Ewing-Maywood R-4 Fire Protection District will be accepting bids for concrete work to be done at the Ewing Fire Station. General work description is the bid should include the tearing out of existing concrete, rock and a tree and then replacing it with new concrete that is 6 inches thick with rebar. The size of the concrete slab will be approximately 80 feet by 100 feet. Any interested parties may contact Bryan Jennings at (573) 248-9035 or David Keith at (573) 248-4789. The Ewing-Maywood R-4 Fire Protection District reserves the right to accept or reject all bids

Post-Bid

Fire / Police

$120,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
59
Bidding Soon
491
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2023

October 30, 2023

Project location map

100 E Main St, Ewing, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.