BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Rochester, Minnesota. Completed plans call for the renovation of a municipal facility.

**As of November 20, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** This project is for a standby generator at 2100 Campus Drive, SE Rochester, MN 55904. Project must be substantially complete by June 30, 2024. Question Cutoff Date: 9/25/2023 03:00 PM (ET) 10/17/2023 Anticipated County Board Award of the Project The following is a general description of the work required for the building construction and site work for the Project named on the title page, hereinafter specified and shown on the Drawings. 1. Unless otherwise specified, the Contractor shall supply labor, transportation, materials, apparatus, fuel, energy, light, scaffolding, tools, services and incidentals necessary for the entire, proper and final completion of his/her work, and shall install, maintain and remove all equipment of the construction and other utensils or items, and be responsible for the safe, proper and lawful construction, maintenance and use of same, and shall construct in the best and most workmanlike manner, a complete Project including everything properly incidental thereto as shown on the Drawings, stated in Specifications and reasonably implied therefrom, all in accordance with the Contract Documents. 2. The extent of work required of each Section contained within this Project Manual shall be the completion of work stated in the section title together with all other relative and necessary items indicated on the Drawings and/or specified herein. a. Section Includes: It is the responsibility of the Contractor to establish the extent of the work required for each Section in order to complete the Project. However, on occasion a list is provided for the convenience of the Contractor to expedite bidding. The Contractor shall verify the completeness of such a list. 1) Include Work Specified Elsewhere: Work required to be provided under this section of work in accordance with the provision of another section. b. Related Sections (and Work): On occasion and for the convenience of the Contractor, a list of work provided under other sections of the Specifications, by others or the Owner, is included. The Contractor shall verify the completeness of such a list. 1) Work required to be provided under other sections of work as per this section shall be listed here for information.

Bid Results

Municipal

$15,849.00

Public - County

Renovation

13

13

3

6

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
75
Bidding Soon
750
All Active Projects
305
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2023

November 2, 2023

img_map_placeholder

2100 Campus Dr SE, Rochester, MN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.