BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Menlo Park, California. Conceptual plans call for site work for a bridge / tunnel.

DISCLAIMER: There is no solicitation at this time. This Sources Sought is not a Request for Proposals. Submission of any information in response to this request is purely voluntary. SLAC will not pay for any costs incurred nor is obligated to respond. All submissions become SLAC property and will not be returned. BACKGROUND: SLAC is operated by Stanford University as a contractor for the United States Department of Energy (DOE) Office of Science (SC). SLAC seeks to increase the maximum X-ray energy capability of an existing hard X-Ray Free Electron Laser (XFEL) facility through the implementation of its LINAC Coherent Light Source II High Energy (LCLS-II-HE) Project. A Low Emittance Injector Tunnel (LEIT) will be part of the supporting infrastructure for the LCLS-II-HE Upgrade. The LEIT will house a lower emittance electron beam source (injector), which is required to achieve the upgrade. Correspondingly, the LEIT Project comprises the design and construction of the tunnel and supporting infrastructure for the injector. The LEIT will be located on the west side of the (SLAC) Campus in Menlo Park, California. SUBMISSION INSTRUCTIONS: Submission Instructions: Interested parties are invited to submit a response to the above questions to jamesy@slac.stanford.edu with "LEIT PROJECT Sources Sought Response" inserted in the subject line of the email. TELEPHONE RESPONSES WILL NOT BE ACCEPTED. Responses shall be received no later than September 27 at 5:00PM PDT. SLAC believes the applicable NAICS code is 237990. All interested firms must be active registered in SAM.gov to be eligible. of construction: More than $10,000,000.00 PERIOD OF : Estimated Acquisition Cycle: 1) April 2024 -RFP Release 2) June 2024 - Bids Due 3) November 2024 - Award Subcontract 4) October 2026 - Complete Construction The Method of Contractor Selection has not been determined at this Time.

Conceptual

Bridges / Tunnels

$10,000,000.00

Public - Federal

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
73
Bidding Soon
1,549
All Active Projects
653
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2024

img_map_placeholder

2575 Sand Hill Rd, Menlo Park, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.