Site work, paving and renovation of a civil project in Crown Point, Indiana. Completed plans call for the renovation of a road / highway; for site work for a road / highway; for paving for a road / highway; water / sewer project; and water / sewer project.

City of Crown Point (Owner) is re- questing Bids for the construction of the following Project: Water Utility Improvements Project. The project includes but is not limited to new 8-inch and 12-inch water mains including connection to existing lines, new hydrants and valves, directional drilling across local and state roads, site improvements at the existing pump stations, electrical and HVAC improvements, and all other work required for the completion of the project. Bids are requested for the following Contract: Water Utility Improvements Project, Phase 4. Bids will be received for a single prime Contract. Bids shall be as shown in the Bid Form. Prospective Bidders may also examine the drawings via the Web-based service of Commonwealth Engineers, Inc. at website. Bidding Documents also may be examined at the office of the City of Crown Point Public Works Department, 705 Industrial Blvd. Crown Point, IN 46307, on Mondays through Fridays between the hours of 7:00 a.m. to 3:00 p.m. The Contract Documents, Specifications and Drawings will be provided via the web-based service of Commonwealth Engineers, Inc. at website. Obtaining the Bidding Documents The Issuing Office for the Bidding Documents are: Commonwealth Engineers, Inc., 7256 Company Drive, Indianapolis, IN 46237 and Commonwealth Engineers, Inc.. 19 N Court Street, Crown Point, IN 46307 Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fri days between the hours of 8:00 am to 5:00 p.m. and may obtain copies of the Bidding Documents from the Issuing Office. Re Specifications and Drawings must also include a return street address; post office box numbers are not acceptable. Contract Documents will not be sold separate from the web-based service (i.e. All plan holders will be required to purchase through the web-based service). Partial sets of Contract Documents, Specifications and Drawings are not available. Questions pertaining to this project shall be submitted directly to Rachel M. Runge, P.E. at Commonwealth Engineers, Inc. via website. Additional questions concerning access to the website may be directed to Commonwealth Engineers, Inc. at (317) 888-1177. All addenda, which may be issued for this Project, will be issued to each plan holder via email. For those whom also purchase printed Contract Documents, printed addenda will be provided as well. All plan holders shall note, the printed documents are provided as a courtesy and do not preclude the plan holder from relying upon the web/ email based materials (i.e. delays in mail delivery will not be considered relevant due to all contract document holders access to materials via web/email). No refunds will be issued for this project. The OWNER reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding. Any bid informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. NO bid may be with- drawn after the scheduled closing time for receipt of bids for at least 90 days. Bid security shall be furnished in accordance with the Instructions to Bidders. Bidders For all further requirements regard- ing bid submittal, qualifications, pro- cedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Bid Results

Water / Sewer

$725,500.00

Public - City

Paving, Renovation, Site Work

60

30

64

7

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Structural Aluminum Framing, Metal Decking, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, Air Duct Accessories, Flexible Connectors, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Watering, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Machining Equipment, Boring Equipment, Drilling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
101
Bidding Soon
1,974
All Active Projects
782
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2023

November 17, 2023

img_map_placeholder

Multiple Locations, Crown Point, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.