BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a bridge / tunnel in Argentia, Newfoundland. Completed plans call for the renovation of a bridge / tunnel.

Closing Time: 2:30 PM (NT) ** Please note that there has been 1 addendum issued for this project. ** Question Acceptance Deadline 2023/10/05 02:30:00 PM NDT The Work generally includes, but it is not necessarily limited to, the repairs for the Ramp and Transfer Bridge. More particularly the work includes, but is not necessarily limited to, the following: Mobilization and demobilization, including all labor and equipment as specified and as required to carry out the work. Pre-Inspection Survey of all components of the work and report to Owner's Representative any and all discrepancies prior to commencing repairs. Clean, sandblast and paint full structural steel members FB2, GA, GB, GC and Lift Beam on Transfer Bridge as indicated on drawings (S01). Replace 200 (total) corroded bolts, nuts and washers with galvanized grade A325M as indicated on drawings (S02). Diameter and length to match existing. Bolt locations to be determined by Owner or Owner's Representative on site. Repair spalling, cracking, and honeycombing for all concrete abutment walls and diaphragms for the underside of Approach Bridge; as shown on drawings (S03). Repair deck slab spalling at underside of deck as shown in Photo #4 on drawings (S03). Fill 30 (total) open holes using non-shrink grout along abutment walls and diaphragm for the underside of Approach Bridge; as shown on drawings (S03). Provide post repair photographic evidence of all components of the work and submit to Owner's Representative upon completion. Submittals: Preparation, submission, and implementation of an approved Construction Schedule. Preparation, submission, and implementation of an approved Site-Specific Safety Plan. Preparation, submission, and implementation of an approved Site-Specific Environmental Protection Plan. Preparation, and submission of a Project Execution Methodology. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Bridges / Tunnels

Public - Federal

Renovation

5

13

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
11
Bidding Soon
119
All Active Projects
40
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2023

November 13, 2023

img_map_placeholder

To Be Determined, Argentia, NL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.