BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for an educational facility in Porterville, California. Completed plans call for site work for a educational facility.

The Work includes installation of one (1) new 4" reduced pressure back flow device and fitment of new device to existing piping. All measurements for fitment is the responsibility of the contractor. Include any and all adjustments to existing piping to accommodate new Wilkins devices. The Porterville Unified School District, acting by and through its Governing Board, hereinafter referred to as the Owner, will receive informal bids for the award of contracts per CUPCCAA requirements for the replacement of One (1) 4" Reduced Pressure Back Flow Device at Los Robles Elementary School The Work shall be completed within 30 calendar days from the date of the Owner's Notice to Proceed. Prevailing Wages: The Project is a public work and under California Labor Code Section 1770 et seq., the Director of the California Department of Industrial Relations ( "DIR") has determined the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work in the locality in which the work is to be performed, for each craft, classification or type of worker needed to execute this Contract. Copies of the rates are on file at the Owner's principal office. It shall be mandatory upon the Contractor and on any subcontractor to pay not less than the said specified rates to all workers employed in the execution of this Agreement. The Owner reserves the right to reject any and all bids and/or waive any informality in any bid received and/or determine in its discretion the responsibility of any bidder, and which bid is most advantageous to the Owner. Unless otherwise required by law, no bidder may withdraw his bid for a period of 30 days after the date set for the opening thereof, or any authorized postponement thereof. The Owner reserves the right to take more than 30 days to make a decision regarding the rejection of bids or the award of the Contract.

Post-Bid

Educational

$325,925.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
18
Bidding Soon
363
All Active Projects
173
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2023

November 9, 2023

img_map_placeholder

500 E Mulberry Ave, Porterville, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.