Site work and new construction of a clubhouse / community center in Midway, Florida. Completed plans call for the construction of a clubhouse / community center; and for site work for a clubhouse / community center.
The project consists of the renovation and expansion of the Eugene Lamb Community Center for the City of Midway, Florida. Work includes demolition of selected interior and exterior elements such as non-load-bearing and load-bearing partitions, doors, windows, finishes, fixtures, and select exterior concrete walks and railings, with preparation for new construction. The new work involves a 4,212 SF addition and interior renovations to the existing 2,606 SF facility, resulting in a total area of 6,818 SF. The addition includes new assembly and business occupancy spaces, offices, storage, restrooms, and support areas. Construction will utilize CMU, metal stud framing, pre-engineered metal building components, aluminum storefront systems, fiber cement siding, EIFS, and new roofing systems including standing seam metal, TPO membrane, and asphalt shingles. Interior improvements will feature new wall, floor, and ceiling finishes, updated lighting and mechanical systems, new casework, and upgraded plumbing fixtures. Site work includes new concrete sidewalks, landscaping, grading, drainage, and utility connections. All work will comply with current Florida Building Codes, accessibility requirements, and project specifications LOCATION 420 Palmer Rd, Midway, FL 32343 PRE-BID QUESTIONS All questions requiring this project should be addressed in written form to office of the Architect by contacting Doug Shuler, AIA, (dshuler@bfbsa.com) The last day to ask questions will be Tuesday, September 16, 2025, at 5:00PM, Eastern Standard Time. TIME OF SUBSTANTIAL COMPLETION The time limit for substantial completion of this work will be 304 (10 Months) calendar days from the Date of Commencement. Project no- 50180567 PROJECT DESCRIPTION The project consists of the renovation and expansion of the Eugene Lamb Community Center for the City of Midway, Florida. Work includes demolition of selected interior and exterior elements such as non-load-bearing and load-bearing partitions, doors, windows, finishes, fixtures, and select exterior concrete walks and railings, with preparation for new construction. The new work involves a 4,212 SF addition and interior renovations to the existing 2,606 SF facility, resulting in a total area of 6,818 SF. The addition includes new assembly and business occupancy spaces, offices, storage, restrooms, and support areas. Construction will utilize CMU, metal stud framing, pre-engineered metal building components, aluminum storefront systems, fiber cement siding, EIFS, and new roofing systems including standing seam metal, TPO membrane, and asphalt shingles. Interior improvements will feature new wall, floor, and ceiling finishes, updated lighting and mechanical systems, new casework, and upgraded plumbing fixtures. Site work includes new concrete sidewalks, landscaping, grading, drainage, and utility connections. All work will comply with current Florida Building Codes, accessibility requirements, and project specifications
Bid Results
Clubhouse / Community Centers
$2,244,315.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 23, 2025
November 24, 2025
420 Palmer Rd, Midway, FL
Related To This Project
Midway, FL
--
Midway, FL
Bid Date: Nov 09 2023
Midway, FL
Bid Date: Nov 15 2023
Midway, FL
Bid Date: Jun 05 2025
Midway, FL
Bid Date: Feb 08 2024
Midway, FL
Bid Date: Mar 20 2024
Midway, FL
--
Midway, FL
--
Midway, FL
Bid Date: Sep 22 2023
Midway, FL
--
Midway, FL
Bid Date: Feb 20 2023
Midway, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.