BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a clubhouse / community center in Midway, Florida. Conceptual plans call for the construction of a clubhouse / community center; and for site work for a clubhouse / community center.

The City of Midway seeks to identify firms with substantial experience and capabilities to provide a variety of architectural and engineering design services including conceptual/preliminary design, design development, public meetings and presentations, preparation of bid and construction documents, and construction administration for construction of a community service building in the City of Midway. The new facility or expansion of an existing facility will be located at 420 Palmer Road, Midway Florida. All work shall follow current code requirements. The selected consultant shall prepare all documents in the formats required by the City and shall adhere to all City deadlines so as not to negatively impact the project schedule. The new building will be known as the Euguene Lamb Jr. Community Center and will house office space for administrative staff, meeting/conference rooms, classrooms, locker rooms with showers, gymnasium (basketball court). It is anticipated that the facility will be a one-story to be determined square foot. Although not preferred, a multi-level facility configuration may be considered during the alternatives analysis phase if space limitations become a factor during the evaluation. The City is interested in pursuing any available and applicable grant funding (source not identified) for construction of this new facility. Interested design professionals should demonstrate experience and success with recent grant funding efforts, if applicable. 2. QUALIFICATIONS Firms interested in providing the required services must submit a Statement of Qualifications containing tabbed sections for the elements identified in the evaluation criteria. LEED or similar energy efficient design concepts should be integrated into the design, though certification is not required. Last Day for Questions December 13, 2023 Tentative award of negotiated contract by City Staff January 5, 2024

Conceptual

Clubhouse / Community Centers

$22,000,000.00

Public - City

New Construction, Site Work

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
21
Bidding Soon
381
All Active Projects
164
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.