BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Chino, California. Completed plans call for site work for a 57,000-square-foot water / sewer project.

**As of November 22, 2023, project was awarded to Jeremy Harris Construction, Inc but awarded amount is not available.** The Agency owns and manages a Desilting Basin and Detention Basin along Magnolia Channel, a local seasonal waterway/drainage course. The channel is typically dry and only flows during and just after rain events. After several years of silt/sediment accumulation, the Desilting Basin is now full of material that must be removed. The Magnolia Channel Desilting Basin and Detention Basin are located southeast of IEUA's Regional Water Recycling Plant No. 5 (aka RP-5) on Kimball Avenue and west of Mountain Avenue. The site includes a concrete-lined 'Desilting Basin' which has a piped connection and a concrete berm/spillway on its south side that allows water to continue to flow into a large earth-bottom 'Detention Basin'. After these two basins fill to a particular depth, water is released over a low concrete spillway on the east side of the Desilting Basin back into Magnolia Channel. Depending on the severity of rainstorms, various quantities of silt and sand accumulate in each basin. The Desilting Basin is approximately 16,000 square feet and currently contains approximately 4 feet (~2,370 cubic yards) of deposited silt material. The Detention Basin, measuring approximately 57,000 square feet, currently contains an approximately 3.5-foot layer (7,400 cubic yards) of deposited material. The project budget will not allow for the complete removal of the silt material from both basins. The silt material can be a mixture of silt, clay, sand, gravel and other debris carried by stormwater. The Agency aims to remove all silt material from the Desilting Basin and as much material from the Detention Basin as the Agency's budget allows. The final volume to be removed will be based on the proposal costs. The Agency is requesting a proposal to: A) remove all silt material (estimated 2,370 cubic yards) and some small amounts of debris (miscellaneous trash and vegetative material) from the Desilting Basin, down to the concrete bottom; and B) per unit cost for removing any additional silt material from the Desilting Basin and Detention Basin. The contractor shall become owner of all removed silt material and debris and will be responsible for loading, hauling, and disposing of the material off-site. Question Deadline 09/27/2023 at 3:00 PM PT Online Q&A Yes The Agency owns and manages a Desilting Basin and Detention Basin along Magnolia Channel, a local seasonal waterway/drainage course. The channel is typically dry and only flows during and just after rain events. After several years of silt/sediment accumulation, the Desilting Basin is now full of material that must be removed.

Award

Water / Sewer

$648,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
484
Active Projects
219
Bidding Soon
3,635
All Active Projects
1,653
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 2, 2023

November 1, 2023

img_map_placeholder

Multiple Locations, Chino, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.