Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Menlo Park, California. Contact the soliciting agency for additional information.
The West Bay Sanitary District (District) is requesting competitive proposals for design-build services to design and construct the "Bayfront Recycled Water Facility Project" ("Project") at the District's decommissioned Bayfront Wastewater Treatment Plant (WWTP) site in Menlo Park, San Mateo County, California. West Bay Sanitary District (District) is implementing the Project to construct a satellite facility at its decommissioned Bayfront WWTP site, recycled water distribution pipeline, pumping and storage, and influent wastewater pumping station and force main. The purpose of the project is to offset potable demands and deliver recycled water to users in the Menlo Park-Bayshore Area. The District is pursuing a recycled water facility with an initial product-water capacity of approximately 0.6 MGD, with provisions to expand this capacity to up to 1.0 MGD in the future. The Request for Qualifications (RFQ) invites those design-build entities interested in responding to this RFQ (Respondents) to submit statements of qualifications (SOQs) associated with providing integrated design-build services to the District for the Project. The qualifications phase is step one of a two-step process the District intents to follow to select a Design-Built Entity ("DB Entity") to complete the Project: Step 1: The qualification phase of the design-build entities, which generates a shortlist of Respondents. Step 2: The technical proposal from the Shortlist. Only those Respondents that are selected at Step 1 will be allowed to participate in Step 2. This procurement is structured to comply with the requirements of California Public Contract Code Section 22160 et seq., as well as other applicable law for procurement and execution of design-build projects by public agencies operating water recycling facilities and/or wastewater facilities. The DB Entity will be responsible for all design-build services comprising this Project, including, but not limited to implementing the five (5) Project scope elements as identified below, and providing the design, construction, project management, surveying, geotechnical investigations, scheduling, quality control, inspection, laboratory testing, permitting, procurement of all labor, materials and equipment, and any other work and services that can be generally identified through start-up and acceptance of the Project by the District. The detailed technical requirements for the Project are being developed and will be presented in the RFP. It is anticipated that, except as restricted by applicable law, the District will reserve the right to require the DB Entity to conduct a competitive bidding process for all elements of the construction work. It is anticipated that the Project will be partially financed with funds from California Clean Water State Revolving Fund (CWSRF or SRF). The Respondents and DB Entity must therefore also meet the requirements of the following: California Senate Bill No. 785, CHAPTER 931 (including California Public Contract Code 22160 et seq., "Local Agency Design-Build Projects") California State Revolving Fund Requirements, including, but not limited to, the American Iron and Steel (AIS) Provisions, Davis Bacon Act, and Disadvantaged Business Enterprise (DBE) requirements.
Post-Bid
Water / Sewer
Public - County
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 19, 2023
February 19, 2024
Multiple Locations, Menlo Park, CA
Related To This Project
Menlo Park, CA
--
Menlo Park, CA
--
Menlo Park, CA
--
Menlo Park, CA
Bid Date: Jan 23 2024
Menlo Park, CA
Bid Date: Dec 18 2023
Menlo Park, CA
Bid Date: Dec 22 2023
Menlo Park, CA
Bid Date: Feb 06 2024
Menlo Park, CA
Bid Date: Jan 23 2024
Menlo Park, CA
--
Menlo Park, CA
Bid Date: Jun 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.