Published December 20, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a water / sewer project in Auburn, California. Completed plans call for site work for a water / sewer project.

A Bid Guaranty in an amount not less than ten percent (10%) of the total aggregate of the bid, including all Additive and/or Alternate Bid Items shall accompany each bid. This Bid Guaranty is to be forfeited should the Bidder, if awarded the contract, fail to enter into the same, or fails to furnish the bonds and/or proof of insurance as stipulated in the Contract Documents. The checks or bond shall be made payable to the Owner. The successful Bidder will be required to furnish both a Faithful Performance Bond in the amount of one hundred percent (100%) and a Payment Bond in the amount of one hundred percent (100%) of the Contract price Question Deadline 10/18/2023 at 4:00 PM PT Written questions regarding the Contract Documents and/or the proposed Work should be directed to Jordan Jakobsen, Associate Engineer by phone at 530-823-4950, or e-mail The estimated cost of construction is $1,750,000. Project Description: In accordance with plans and specifications prepared by Water Works Engineers, LLC, the Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of water treatment plant improvements, including but not limited to the following: Remove and dispose of existing 27" raw water piping and existing 30" slide gate. Demolition and disposal of existing flocculation basin infrastructure including existing paddle flocculators, rapid mixer, concrete supports, handrail and grating. Demolition and disposal of existing influent 18" piping, butterfly valve, and flowmeter. Supply and install new influent 18" piping, flowmeter, butterfly valve, and chemical injection piping. Supply and install new 30" raw water piping and associated chemical injection piping and vault. Supply and install of new 30" slide gate. Supply and install (6) vertical turbine flocculators with motor center addition and (1) rapid mixer. Supply and install miscellaneous metals including beams, grating, handrail, and davit bases. Construction of intake screen channel, supply and installation of automatic fine screen with controls. The total Contract Time to achieve Final Completion is 480 calendar days

Award

Water / Sewer

$2,074,000.00

Public - County

Site Work

40

21

5

5

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
8
Bidding Soon
924
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2023

December 25, 2023

Project location map

595 Christian Valley Rd, Auburn, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.