BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 9, 2023 at 7:00 PM

Updated May 25, 2024

Site work and paving for a mixed-use development in Indianapolis, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

If There Are Any Questions Concerning the Contract Documents, Please Contact Gretchen S. Zortman at Gretchen.zortman@indy.gov The participation goal for Veteran Business Enterprise (VBE) is three percent (3%). The participation goal for Disability-owned Business Enterprise (DOBE) is one percent (1%). Prospective bidders are strongly urged to attend the pre-bid conference to learn about other efforts to meet MBE/WBE/VBE/DOBE goals. All Bidders will be subject to the MBE/WBE/VBE/DOBE Business Utilization Plan ("Utilization Plan"), of the City of Indianapolis. In evaluating a Bidder's responsibility, the City will consider the Bidder's Affirmative Action plan. For accommodations needed by persons with disabilities to attend the public bid opening meeting, please call 327-4900. The City of Indianapolis reserves the right to reject any or all bids or to waive any informalities and to accept the bid which it deems most favorable to the interests of the City after all bids have been examined and canvassed. Contract Documents for the Project/Work have been assembled into one or more bound Project Manuals which, together with Drawings, may be examined at online or at the following locations: City of Indianapolis Purchasing Department 200 East Washington Street Suite 1522, City-County Building Indianapolis, Indiana 46204 Repro Graphix 437 North Illinois Street Indianapolis, Indiana 46204 A Bid Bond or certified check in an amount not less than five percent (5%) of the amount bid must be submitted with each Bid. A one hundred percent (100%) Performance and Payment Bond will also be required of the successful Bidder. The Work consists of, but is not necessarily limited to the following: Reconstruction of Market Steet between Pine Street and Highland Avenue. Including full depth pavement replacement, curb and sidewalk replacement, and Landscaping. Project Range: $2,000,000 - $3,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This Work will be funded by the City of Indianapolis. The participation goal for Minority Business Enterprise (MBE) for this contract isfifteen percent (15%). The participation goalfor Women Business Enterprise (WBE) for this contract is eight percent (8%). The participation goal for Veteran Business Enterprise (VBE) isthree percent (3%). The participation goalfor Disability-owned Business Enterprise (DOBE) is one percent (1%).

Award

Roads / Highways

$2,926,000.00

Public - City

Paving, Site Work

82

11

10

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
106
Bidding Soon
1,176
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2023

December 18, 2023

Project location map

Multiple Locations, Indianapolis, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.