BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 25, 2023 at 8:00 PM

Updated November 15, 2023

Renovation of a mixed-use development in Brethren, Michigan. Completed plans call for the renovation of a educational facility.

Kaleva Norman Dickson School Re-Air Conditioning Project The addition of air conditioner to the existing school HVAC system. A bid security will be required A Performance Bond and Payment Bond will be required. This project will occur during the school summer break. All work on premises or within the building may not commence until Monday, June 10, 2024. The project must be complete in its entirety including all refuse, tools and materials off site on or before Friday, August 16, 2024. All questions are to be directed to the Construction Manager. Do not contact the Owner unless directed by the Project Manager.

Post-Bid

Educational

$325,000.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
21
Bidding Soon
326
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2023

June 10, 2024

Project location map

4400 N High Bridge Rd, Brethren, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.