BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 4, 2024 at 8:00 PM

Updated November 14, 2024

Renovation of an educational facility in Orlando, Florida. Working plans call for the renovation of a educational facility.

*As of Septemebr 04, 2024, project is still in the Design Development stage. It is anticipated construction will start in September 2025 and be completed in July 2027. *The closed solicitation has been included below for reference: Major elements of the project include: A comprehensive renovation project for Timber Creek HS at 1001 Avalon Park Blvd, Orlando, FL, 32828. Comprehensive renovation and remodeling of the entire campus to provide improved facilities meeting Orange County Public Schools' Design Guidelines and educational program requirements. The project scope includes all renovations needed to address current deficiencies and to upgrade all building and site facilities, systems, and finishes at or near the end of their useful life, and design capacity. The scope also provides for the remodeling of existing spaces to support current programs, and identify functional equity space needs, life safety, and accessibility requirements. The project will also include a classroom addition. Construction will occur on an occupied campus. The scope will include any temporary facilities and classrooms required to support construction phasing. The estimated construction cost is $92,382,000. Due to the complexity and variety of scope items, preference will be given to a Prime with Architectural experience. The information contained in this e-mail message is intended solely for the recipient(s) and may contain privileged information. Tampering with or altering the contents of this message is prohibited. This information is the same as any written document and may be subject to all rules governing public information according to Florida Statutes. Any message that falls under Chapter 119 shall not be altered in a manner that misrepresents the activities of Orange County Public Schools. [References: Florida State Constitution I.24, Florida State Statutes Chapter 119, and OCPS Management Directive A-9.] If you have received this message in error, or are not the named recipient notify the sender and delete this message from your computer. Target Schedule: Design/Pre-construction Services Commencement: April 2024 Construction Notice to Proceed: September 2025 Substantial Completion: July 2027

Pre-Construction/Negotiated

Educational

$92,382,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
290
Active Projects
154
Bidding Soon
1,977
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.