BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Avon Park, Florida. Completed plans call for the renovation of a clubhouse / community center.

M/WBE's are encouraged to participate in the bid process. The City of Avon Park is seeking proposals, from qualified HVAC Contractors that have been in business at least five (5) years, to provide all necessary labor and material to remove and replace Air Conditioning equipment at the Avon Park Boys and Girls Club located at 207 State Street in Avon Park, FL 33825. The equipment to be replaced will include the following: 27.2 Two (2) 15-ton Air Handling Units that are located above the gym. These units will be 6,000 CFM Single Zone Air Handling Units, Built-Up, Constant Volume, Horizontal/Vertical, with Drawthrough Fans. 27.3 Four (4) 7.5-ton Air-Cooled Condensing Units with Compressor, Condenser, Fan and Motor. These units will be for the AHU's above the gym. 27.4 One (1) 1,200 CFM Single Zone Air Handling Unit, Built-Up, Constant Volume, Horizontal/Vertical, with Draw-through Fan. This unit will be for the classrooms. 27.5 One (1) 3-ton 14 SEER, Air-Cooled Condensing Unit, Pre-Charged with refrigerant capable of charging the system with a 20' length of piping. This unit will be for the classrooms' AHU. 27.6 One (1) 1,600 CFM Single Zone Air Handling Unit, Built-Up, Constant Volume, Horizontal/Vertical, with Draw-through fan. This unit will be for the office and entry area. 27.7 One (1) 4-ton, 14 SEER, Air-Cooled Condensing Unit, Pre-Charged with refrigerant capable of charging the system with a 20' length of piping. This unit will be for the office and entry area's AHU. 27.8 One (1) 2,000 CFM Single Zone Air Handling Unit, Built-Up, Constant Volume, Horizontal/Vertical, with Draw-through Fan. This Unit will be for the field house behind the main building. 27.9 One (1) 5-ton 14 SEER, Air-Cooled Condensing Unit, Pre-Charged with refrigerant capable of charging the system with a 20' length of piping. This unit will be for the field house's AHU. 27.10 Copper fittings and pipe will be used for all replacement Question Deadline 10/18/2023 at 4:00 PM ET

Post-Bid

Clubhouse / Community Centers

$1,386,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
65
Bidding Soon
1,338
All Active Projects
564
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.