Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Riverdale, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.
2022 PY CDBG Alley Reconstruction Project All proposals or bids offered must be accompanied by a bid bond, cash, or a certified or cashier's check made payable to the President and the Board of Trustees of the Village of Riverdale in the amount of not less than five percent (5%) of the total amount of the proposal as a guarantee that if the proposal is accepted, a contract will be entered into and the performance of the contract is properly secured. No bid shall be withdrawn after the opening of the proposals without the consent of the President and the Board of Trustees of the Village of Riverdale for a period of 45 days after the scheduled time of closing bids. The successful bidder for the construction of the improvement will be required to file a performance bond equal to one hundred percent (100%) of the bid, with sureties to be approved by the President and Board of Trustees, which performance bonds shall be conditioned upon proper and faithful performance by the Contractor of the work specified in accordance with the plans and specification therefore, according to the time and terms and conditions of the contract; and also that the bidder and contractor shall properly pay all debts incurred by the Contractor in the execution of the work, including those for labor and materials furnished. Payments to the Contractor will be made by the Village only after it has received the funds to make such payments from the County of Cook in accordance with the terms of the aforesaid agreement. Applicable Federal Requirements All laborers and mechanics employed by Contractor or Subcontractor(s) on construction work for this project shall be paid wages at rates not less than those prevailing on similar construction in the locality as determined by the Secretary of Labor in accordance with the Davis-Bacon Act as amended (40 U.S.C. 276-276a-5), and shall receive overtime compensation in accordance with and subject to the provisions of the Contract Work Hours and Safety Standards Act (40 U.S.C. Sections 327-333), and the Contractor and Subcontractor(s) shall comply with all regulations issued pursuant to these Acts and other applicable Federal laws and regulations pertaining to labor standards. The Contractor shall be required to furnish sufficient insurance or guaranty of indemnity to the Village of Riverdale, Illinois, the County of Cook, Illinois, and the Engineer against any and all claims which might arise for damages to persons or property due to the negligence of the Contractor or Subcontractors, or their officers, agents, employees or servants, during the construction of said improvement and until the said improvement has been finally accepted as complete by the President and Board of Trustees of the Village of Riverdale, Illinois. The right to reject any and all proposals or bids is reserved. Excavation of asphalt alley pavement and installation of aggregate base course with geogrid material, pavement removal, curb removal, sidewalk removal, garage apron removal, adjustment of frames and lids, installation of storm sewer structures, installation of combination concrete curb and gutter Type B-6.12, pcc sidewalk, pcc driveway aprons, pcc alley pavement at alley returns, installation of hma binder course (IL 19,0), Installation of hma surface course (Mix D), Clss D pavement patching and landscape restoration
Award
Roads / Highways
$179,790.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 9, 2023
November 8, 2023
Multiple Locations, Riverdale, IL
Related To This Project
Riverdale, IL
Bid Date: Nov 15 2023
Riverdale, IL
Bid Date: Jan 18 2024
Riverdale, IL
Bid Date: Jan 31 2024
Riverdale, IL
Bid Date: Apr 25 2024
Riverdale, IL
Bid Date: May 08 2024
Riverdale, IL
Bid Date: Apr 25 2024
Riverdale, IL
--
Riverdale, IL
Bid Date: Jun 17 2022
Riverdale, IL
Bid Date: Nov 12 2021
Riverdale, IL
Bid Date: Jan 11 2022
Riverdale, IL
Bid Date: Mar 02 2022
Riverdale, IL
Bid Date: May 09 2023
Riverdale, IL
--
Riverdale, IL
Bid Date: Jan 31 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.