BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Berkeley, California. Completed plans call for site work for a water / sewer project.

Question Deadline 10/10/2023 at 5:00 PM PT The work of this contract is briefly summarized as follows: The work to be done consists of, but is not limited to: a) Point (spot) repairs of sanitary sewer line at various location. This work requires coordination with City and private property owners b) CIPP lining (Method "A") of approximately 873 linear feet of 6-inch and 8-inch diameter sanitary sewer mains. c) Pipe-bursting (Method "B") of approximately 3,814 linear feet of 6 to 12-inch diameter sanitary sewer mains. d) Traditional Open-trench (Method "C") replacement of approximately 453 linear feet of 6 to 12-inch diameter sanitary sewer mains. e) Slip lining of approximately 183 linear feet of 8-inch diameter sanitary sewer main f) Construction and rehabilitation of maintenance holes, including excavation and related work. g) Abandonment of sanitary sewer mains and structures, as indicated in plans. h) Replacement in kind of concrete stairway and metal handrail. i) Traffic Control Plans (TCP) shall emphasize pedestrian, bicycle, safety and access. TCP shall be prepared to avoid and minimize construction impacts on pedestrian, bicycle, and bus facilities in Berkeley consistent with the City's policies. TCP shall follow guidance and intent provided in Appendix 10. j) Work sites within City of Berkeley Fire Zone 2 are subject to restrictions imposed during the Red-Flag warnings. k) Portions of the work sites are located on private properties with limited access. Traffic Control Plans (TCP) must be prepared to avoid and minimize construction impacts on pedestrian, bicycle, and bus facilities in Berkeley consistent with the City's policies. TCP must follow guidance and intent provided in Appendix. Project includes sites located within City of Berkeley Fire Zone 2 which are subject to restrictions imposed during Red Flag Warning events declared by the City of Berkeley. California Contractor License Classification required: A General Engineering, or C-34 Pipeline, or C-42 Sanitation System. Pre-Award Conference: The apparent low bidder will be invited to a pre-award conference scheduled for 11:30 A.M., Tuesday, December 5, 2023 at 1947 Center Street, 4th Floor, Berkeley, CA.

Award

Water / Sewer

$3,456,596.00

Public - City

Site Work

37

18

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
53
Bidding Soon
1,805
All Active Projects
778
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2023

February 8, 2024

img_map_placeholder

Multiple Locations, Berkeley, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.