BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2023 at 7:00 PM

Updated December 6, 2024

Site work for a civil project in Streamwood, Illinois. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

Culvert lining project designated as Parkside Circle Culvert Lining. The project includes the preparation, repair and lining of four 75-foot long, 72-inch diameter corrugated metal pipe culverts. Bidders must comply with the Illinois Statutory requirements regarding labor, including Equal Employment Opportunities Laws. The Village reserves the right to reject any or all Bids and to waive technicalities.

Award

Bridges / Tunnels

$258,450.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
517
Active Projects
277
Bidding Soon
3,784
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2023

November 23, 2023

Project location map

901 Parkside Cir, Streamwood, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.