BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fitness / recreation center in Streamwood, Illinois. Completed plans call for the renovation of a fitness / recreation center.

Sealed lump sum bids for the Spa and Filtration System Replacement at the Streamwood Park District Park Place Family Recreation Center in Partnership with Rush Physical Therapy Bids are invited from qualified general contractors. Contractors must be certified by IDPH. Immediately following this time, The project scope includes, but is not limited to, the following: select interior demolition and replacement of the existing spa and filtration system at Park Place Family Recreation Center, located within the main pool area. The Streamwood Park District encourages minority business firms to submit bids on this project and the successful contract bidder to utilize minority businesses as sub-contractors for supplies, equipment, services, and construction. The District has applied for a State Grant that will be awarded to the District dependent upon achieving 18% MBE and 10% WBE for a total of 28% Minimum Participation. The Park District reserves the right to waive all technicalities, to accept or reject any or all bids, to accept only portions of a bid and reject the remainder. The Park District will award the Contract to the lowest responsible and responsive Bidder, as determined by it. In considering the Bidder's responsibility, the Park District may evaluate, among other factors, the ability of the Bidder to provide experienced labor sufficient in numbers to timely and properly complete the work, the financial capability of the Bidder, the performance of the Bidder on other projects, and whether the Bidder is debarred by the Illinois Department of Labor from performing public works projects in Illinois For more information, contact Steve Meyer, Facilities and Trades Manager, at 630-327-6184

Bid Results

Fitness / Rec Centers

$225,000.00

Public - City

Renovation

14

5

32

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
101
Bidding Soon
2,060
All Active Projects
893
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2024

June 8, 2024

img_map_placeholder

550 S Park Blvd, Streamwood, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.