Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Indio, California. Contact the soliciting agency for additional information.
The purpose of this document is to facilitate the selection of a qualified consulting firm to assist with the preparation of a water rate study for the Indio Water Authority (IWA). IWA is currently evaluating the full cost of compliance with new water quality requirements including Chromium 6. Based on current estimates the cost of compliance with these requirements will require between $60 million and $100 million dollars for planning, design, and construction of appropriate water treatment facilities to mitigate the Chromium 6 contamination. In addition, IWA has identified additional capital facilities in the next five years which have not been included in previous Capital Improvement Plans (CIPs). IWA intends to fund the required improvements through a combination of methods including, but not limited to, bond financing, water rate increases, and development fee increases. This project will not be a cost-of-service study and will not include evaluating the current budget-based water rates or adjusting water use tiers. Consultants are urged to submit concise proposals, appropriate to the scale of the project and include only items that are relevant to this specific project. The Fee Proposal shall be submitted in a separate email with Subject line "Fee Proposal for Indio Water Authority - Water Rate Study". IWA reserves the right to reject any or all responses received as a result of this solicitation; to extend the submission due date for; to modify, amend, reissue or rewrite this document; and to procure any or all services by other means. IWA will not be liable for any costs incurred by the consulting firms' incidentals to the preparation of proposals or for developing and carrying out interview presentations, if needed. Submission of a proposal indicates acceptance by the firm of the conditions contained in this Request for Proposals (RFP) and Sealed Fee Proposal, unless clearly and specifically noted in the proposal submitted and confirmed in the contract between the Indio Water Authority and the firm selected. The Water Rate Study will require the selected consultant (Consultant) to perform all necessary analyses and documentation to perform the study of IWA's utility rates and recommend a five-year (5-year) rate schedule for the water utility. In general, the scope of work shall involve a comprehensive review of: o IWA's water enterprise funds' historical and projected revenues o Water usage o Expenses Reserve policies o Collection procedures o Rates and charges o Current budgets o Water Master Plan o Capital improvement plans o Future planned growth of the City o Any other information deemed pertinent November 15, 2023 Award Consultant Contract November 2023 - June 2024 Complete Study and Adopt New Rates Deadline to Submit Questions October 13, 2023 by 5:00 PM The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 16, 2023
Multiple Locations, Indio, CA
Related To This Project
Indio, CA
Bid Date: Oct 26 2023
Indio, CA
Bid Date: Nov 16 2023
Indio, CA
Bid Date: Nov 20 2024
Indio, CA
Bid Date: Dec 06 2023
Indio, CA
Bid Date: Oct 19 2023
Indio, CA
Bid Date: Oct 23 2023
Indio, CA
Bid Date: Sep 13 2022
Indio, CA
Bid Date: Mar 23 2022
Indio, CA
Bid Date: Jan 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.