BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 27, 2023 at 7:00 PM

Updated January 29, 2024

Site work for a civil project in Charleston, South Carolina. Completed plans call for site work for a water / sewer project.

Contract Award Date: Dec 26, 2023 Contract Award Number: W912HP24C0001 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Q8GBD1LD7DE3 Contractor Awarded Name: WATERFRONT PROPERTY SERVICES, LLC Contractor Awarded Address: Clearwater, FL 33760 USA Base and All Options Value (Total Contract Value): $17,979,800.00 PURPOSE OF THIS ANNOUNCEMENT: This announcement constitutes a pre-solicitation announcement of a proposed contract action pursuant to FAR 5.204. This is not a solicitation. No response is requested at this time. A formal solicitation will follow this announcement with full details, including a response deadline, the complete price proposal schedule, the construction plans & specifications, instructions to offerors, and the evaluation factors/basis for award. OFFERORS ARE RESPONSIBLE FOR MONITORING THIS WEBSITE FOR CHANGES TO THIS NOTICE AND THE FORMAL SOLICITATION ANNOUNCEMENT. PLANNED SOLICITATION: The final Solicitation for this project will be announced anytime between 15 and 30 days after the posting of this pre-solicitation. The contract type will be firm-fixed-price. DESCRIPTION OF WORK: The work consists of placing approximately 1,280,000 cubic yards of dredged material on Folly Beach, and 40,000 cubic yards of dredged material on Bird Key. Suitable borrow material will be dredged from the Folly River Federal Channel and Folly River Borrow Area, Charleston County, South Carolina. The work includes before and after surveys of the beach areas and monitoring structures adjacent to Folly Beach during construction. The work includes complying with the requirements of the Endangered Species Act and Marine Mammals Protection Act. OF WORK: $10,000,000 TO $25,000,000 The contractor must be registered in WWW.SAM.GOV prior to award of the solicitation The method of Contractor Selection has not been Determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$17,979,800.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
68
Bidding Soon
731
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2023

Project location map

To Be Determined, Charleston, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.