EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 1, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Grants Pass, Oregon. Completed plans call for the renovation of a educational facility.

The Grants Pass School District Requests Bids from experienced Contractors for the construction of site improvements and placement of modular classroom additions at the new Grants Pass Flexible Learning Experience (GPFLEX) Campus, to be built adjacent to the Grants Pass High School in Grants Pass Oregon. The overall project consists of the addition of four pre-manufactured modular classrooms/administration space at the new GPLEX Campus located next to the Grants Pass High School. It includes coordination with the modular building supplier for placement and associated site/utility/foundation work. The project includes all labor, materials, and equipment necessary, unless specifically excluded. The following deadlines and restrictions are applicable to the project: The work is scheduled to start in on November 6, 2023 and Contracts must meet a Substantial Completion date of January 8, 2024. All bids must be submitted on the bid forms furnished to the prospective bidders. Each bid must be accompanied by an unconditional cashiers check, certified check, or surety bond of the bidder in the amount of ten percent (10%) of bid values received. Unsuccessful bidders will have their security refunded to them when the contract has been awarded. Any objections to or comments upon the bid specifications must be submitted in writing to the attention of Tommy Blanchard, Operations Manager, at 725 NE Dean Dr. Grants Pass, OR 97526 or by email at tmblanchard@grantspass.k12.or.us. To be considered, such objections or comments must be received at least SEVEN (7) working days before the bid closing date. This contract is for a public work subject to ORS 279C.800 to 279C.870 (the Oregon Prevailing Wage Rate Law). BOLI wage rates will be applicable to this project. No bid for a construction contract shall be received or considered by the public contracting agency unless the bidder is licensed by the Construction Contractors Board of the State of Oregon as required by ORS 701.035 and 701.055. Each bid must identify whether the bidder is an Oregon resident bidder, as defined in ORS 279A.120. Bidder's attention is directed to compliance with ORS 279C.370 regarding submission of the First-Tier Subcontractor Disclosure Form. If the contract amount exceeds $100,000.00, the First-Tier Subcontractor Disclosure Form will be required and may be submitted either with the bid or within two (2) hours after the bid closing time and date at the bid site address. Failure to provide the First-Tier Subcontractor Disclosure Form may result in bid rejection. The Grants Pass School District reserves the right to reject any or all bids, to waive formalities, and to postpone the award of the contract for thirty (30) days. All bids and all prices quoted in bids shall be firm for a period of thirty (30) days after the bid closing date.

Post-Bid

Educational

$800,000.00

Public - City

Renovation

132

18

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Joists
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Exterior Insulation and Finish Systems
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Quarry Tiling, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Piping and Pumps, Facility Storm Drainage, Roof Drains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Site Improvements, Fences and Gates, Chain Link Fences and Gates, Planting, Turf and Grasses, Plugging, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
5
Bidding Soon
103
All Active Projects
42
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2023

November 6, 2023

img_map_placeholder

710 NE Dean Dr, Grants Pass, OR

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

GPFLEX Modular Addition Project 2023

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.