BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a civil project in Oakland, California. Completed plans call for site work for a road / highway; and water / sewer project.

As of February 16, 2024 project has not yet been awarded. The Project is expected to be awarded on February 20,2024 during the Board Meeting.** The work to be done under this contract includes the installation of the Contech Dual Stage Hydrodynamic Separator (DSBB 11-24-144) and the diversion system at the location on Cary Avenue between Hale Avenue and Edes Avenue in the City of Oakland as shown on the Plans and specified in these Specifications. The DSBB will be furnished by the City. The Contractor shall coordinate with the DSBB manufacturer for the delivery of DSBB to the jobsite, and shall be responsible for off-loading and installing the DSBB and appurtenances. The work shall include, but not limited to, mobilization, traffic control, temporary fencing and barricade, clearing and grubbing, water pollution control, dust control, control of ground and storm drain waters, construction survey and staking, installation of shoring system; removal and disposal of existing concrete box culvert; replacement of existing sanitary sewer line; removal and replacement of existing concrete and asphalt concrete pavements, sidewalks, driveways, curbs and gutters where required, saw cutting; installation of signage; removal and disposal of debris and materials, conducting soil testing, excavation of existing soil, disposal of excavated materials, preparation of subgrade, supplying and placement of structure base materials and pipe bedding materials; structure excavation and backfill; trench excavation and backfill; roadway excavation and backfill; furnishing and installation of materials and components of the storm water treatment unit, sump, riser, manhole/access hatches; supplying and placement of structural concrete, junction boxes, weir wall; installing 60" RCP piping; furnishing and installation of manholes, manhole frames and covers; furnishing and placement of imported backfill materials, permanent and temporary resurfacing, protection of existing facilities and utilities; fence/metal railing replacement, as well as furnishing and installation of the associated appurtenances necessary or required to satisfactorily complete the work as shown on the Plans and required in these Specifications. Questions Due: October 13, 2023 by 2:00 PM by email to the Project Manager. It is the Contractors responsibility to ensure that the email is received by the Project Manager The work to be done under this contract includes the installation of the Dual Stage Hydrodynamic Separator (DSBB) (to be furnished by the City) and the diversion system at the location on Cary Avenue between Hale Avenue and Edes Avenue in the City of Oakland as shown on the Plans and specified in these Specifications. The work embraced herein shall be done in accordance with these project specifications and drawings (if any), including, but not limited to, the "Standard Specifications for Public Works Construction 2015 Edition" (GREENBOOK), the "Standard Details for Public Works Construction 2002 Edition", and the State of California, Department of Transportation, Standard Specifications and Standard Plans, dated 2010, when applicable for certain applicable State Standard drawings that are specified herein. All documents, City of Oakland programs, policies and regulations referenced herein are incorporated as if attached hereto or herein repeated. The work to be done under this contract includes the installation of the Dual Stage Hydrodynamic Separator (DSBB) (to be furnished by the City) and the diversion system at the location on Cary Avenue between Hale Avenue and Edes Avenue in the City of Oakland Questions Due : January 18, 2024 Engineer's Estimate: $ 2,992,700.00

Bid Results

Water / Sewer

$3,330,550.00

Public - City

Site Work

17

5

25

10

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
89
Bidding Soon
1,878
All Active Projects
783
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

March 15, 2024

img_map_placeholder

Edes Ave & Hale Ave, Oakland, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.