This is a service / maintenance or supply contract in Oakland, California. Contact the soliciting agency for additional information.

The Roosevelt Middle School Modernization Project is comprised of several work scopes and phases. 1. Increment #1 includes Site Preparation for Interim Housing and Modular Science Building (not in Commissioning Scope of Work). 2. Increment #2 (Interim Housing) includes but not limited to the delivery and placement of Interim Housing consisting of 13 (24'x40') classroom portables, one (40'x48') administration office portable, and one (12'x40') restroom portable (not in Commissioning Scope of Work). Construction Schedule: start 12/2023 and finish 7/31/2024 3. Increment #2 (Modular Science Building) includes but not limited to the delivery and placement of a (40'x96') Modular Science Building and one (12'x40') restroom portable. Construction Schedule: start 12/2023 and finish 7/31/2024 4. Building "A" alterations shall include but not limited to voluntary seismic upgrades, re-roofing, new heating and ventilation system, modifications of existing fire sprinkler system, fire alarm, intrusion alarm, clock/bell/PA and data/network systems. Building "A" was built in 1922 and it was reconstructed in 1935 to comply with the Field Act. The two-story structure includes administration office spaces, classrooms, 1012-seat auditorium with stage and balcony, and La Clinica health clinic. The Lower Level is 32,971 s.f., the First Floor is 45,365 s.f. and the Mezzanine is 7,000 s.f. Total building area is 78,336 SF Alterations to Building "A" shall include, but not limited to, voluntary seismic upgrades, re-roofing, enlarging existing classrooms, new heating and ventilation system, main office renovation, new entry ramp, ADA parking stalls, modifications of existing fire sprinkler system, fire alarm, intrusion alarm, clock/bell/PA and data/network systems. Scope includes new 3000Amp switchgear equipment to replace existing switchgear and new PG&E transformer pad. Renovation of the Main Building (Building "A") will be completed in two phases by splitting Building "A" in two halves: Half of the students and teachers plus administrative staff will be relocated from the Main Building (in phase 1) to portable interim housing while the other half remains in Building "A". When construction in phase 1 is completed, the second half of the students and teachers will be relocated (phase 2) to portable interim housing while those in phase 1 re-occupies Building "A". The health clinic will remain occupied during both phases. Construction Schedule: start 9/2024 and finish 7/31/2027 (approx. 3 years) The Oakland Unified School District ("District") is requesting proposals from experienced firms, partnerships, corporations, associations, persons or professional organizations ("Consultants") to provide Building Commissioning (Cx) services associated with the modernization of Roosevelt Middle School ("Project"). Question Deadline 06/28/2023 at 4:00 PM If you have any questions regarding this RFQ/P and/or submitting proposal electronically, please email Kenya Chatman at kenya.chatman@ousd.org and cc: to Colland Jang at colland.jang@ousd.org July 6, 2023 District will provide written responses to requests for clarification The District reserves the right to waive any informalities or irregularities in the RFQ/P Packets. The District also reserves the right to reject any and all RFQ/P Packets and to negotiate contract terms with one or more Respondents. The District hereby affirmatively ensures that Disadvantaged Business Enterprises ("DBE"), Small Local Business Enterprise ("SLBE"), Small Emerging Local Business Enterprise ("SELBE") and Disabled Veterans Business Enterprise ("DVBE") firms shall be afforded full opportunity to submit qualifications in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, disability, gender, transgender status, political affiliation, or religion in any consideration leading to the award of contract. No qualified disabled person shall, on the basis of disability, be excluded from participating in, be denied the benefits of, or otherwise by subjected to discrimination in any consideration leading to the award.

Conceptual

Educational

$49,000,000.00

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
47
Bidding Soon
1,830
All Active Projects
783
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2023

img_map_placeholder

1926 E 19th St, Oakland, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.