BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Asbestos abatement and renovation of a mixed-use development in Chicago, Illinois. Completed plans call for the renovation of a educational facility; and for asbestos abatement for a educational facility.

Provide Labor and Materials: Selective Removal of Asbestos Containing Floor Tile and Mastic from Lower Level Gym Storage, Gym Office Stair Landing and 2nd Floor Corridor. All work shall be coordinated with Board authorized representatives, Managing Environmental Consultant and Building Engineer to complete during dates identified in Project Manual. All work shall be completed in two (2) work phases. Phase I - Winter Break - December 22, 2023 thru December 28, 2023 Phase II - Summer Break - July 1, 2024 thru July 8, 2024 If bid price is over $25,000, you MUST submit a bid bond at time of bid. If bid price is over $50,000, you MUST submit a payment and performance bond if awarded a project. If bid price is over $75,000, you MUST include your MBE/WBE subs and relevant forms at time of bid. The proposal shall be submitted with the attached Bid Cover Sheet completed in its entirety. Warranty information, when applicable, shall also be included & submitted. All work to be performed during normal working hours. If bid price is over $25,000 or more, bidder must be signatory to relevant union, per terms of the Various Trades Contract and Project Labor Agreement. If bid price is over $75,000, you MUST include your MBE/WBE subs and relevant forms at time of bid.

Bid Results

Educational

$26,700.00

Public - City

Asbestos Abatement, Renovation

4

7

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
94
Bidding Soon
1,803
All Active Projects
798
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2023

December 22, 2023

img_map_placeholder

7931 S Honore St, Chicago, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.