BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Newville, Pennsylvania. Completed plans call for site work for a water / sewer project.

FM 7457.1 General Construction (0.1) Prepare existing site and provide all labor and materials to properly install two sanitary sewer pump stations, force mains, and chemical treatment building as part of the Sanitary Sewer System Improvements. The project also includes the potable water piping as part of the Potable Water System Improvements as shown on the construction drawings and as specified along with all requirements to make the systems 100% functional and code compliant for the projects located in Newville, Cumberland County. Bldg. 82R451 (Rest Area 45) at Mile Marker 38 Northbound on I-81 Bldg. 82R461 (Rest Area 46) at Mile Marker 39 Southbound on I-81 Project Cost Range: $5,000,000.00 - $7,499,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 0.00% Pre-bid Meeting: Optional Wage Rates: Yes Prequalification Requirement: No State Type of Work: Miscellaneous Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - FM 7457 RSR 45/46 Sewer and Water System GC *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A. The project consists of providing labor and materials to install two sanitary sewer pump stations, 16,000 linear feet of 4-inch HDPE force mains, and chemical treatment building as part of the Sanitary Sewer System Improvements. This portion of the project also includes completing restroom fixture upgrades to each rest area building. B. The project also consists of providing labor and materials to install 12,000 linear feet of 4-inch HDPE potable water piping as part of the Potable Water System Improvements. 1. Contractorshall provide and install all materials required to install the sanitary sewage pump stations, forcemains, and chemical treatment building under the general construction portion of this contract. 2. Contractor shall provide and install all materials required to install the potable water system under the general construction portion of this contract.

Award

Water / Sewer

$4,263,000.00

Public - State/Provincial

Site Work

91

29

33

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
58
Bidding Soon
1,132
All Active Projects
489
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

April 29, 2024

img_map_placeholder

FM-7457, Newville, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.