BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2025 at 7:00 PM

Updated March 4, 2025

Site work for a mixed-use development in Grimsby, Ontario. Conceptual plans call for site work for a road / highway; and water / sewer project.

Regional Road 81 (Main St W) - 4 Phase Project in Town of Grimsby. Phase 1 - RR81 Main St E from Park Rd to the Durham Rd roundabout, a length of approx. 1.6km; Construction currently targeted spring 2026. Phase 2 - RR81 Main St E from Park Rd to Baker Rd a length of approx. 0.8km; Construction currently targeted spring 2028. Phase 3 - RR81 Main St E from Baker Rd to Nelles Rd, a length of approx. ; Construction TBD. Phase 4 - RR81 Main St E from Nelles to Orchard Rd, a length of approx. 0.6km; Construction TBD. TIMELINE: Detailed designs are underway. Construction will be completed in 4 phases, beginning in 2026 as per owner's Capital Budget scheduling. Each phase will be covered as tender are issued pending owner's decision to proceed. Coverage of this report has been discontinued.

Project Abandoned

Roads / Highways

Public - County

Site Work

27

18

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
464
Active Projects
192
Bidding Soon
4,653
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.