BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a power facility in Pasadena, California. Completed plans call for the renovation of a power facility.

The Contractor's work shall include the furnishing of all labor, material, equipment, apparatus, transportation, and all other services necessary and incidental to the construction of an oil containment system in a high voltage energized substation, as required by the Water and Power Department, including but not limited to the following: 1. Pothole and verify location of high voltage underground power duct to avoid conflict with construction. 2. Removal and replacement of existing pavement, subgrade, grounding, etc. 3. Removal and disposal of oil contaminated soil and gravel. 4. Excavation, backfill, compaction and shoring. 5. Installation of conduit, including concrete encasements. 6. Construction of reinforced concrete oil containment trench, catch basins and pull boxes. 7. Installation of traffic rated grating cover over the oil containment trench. 8. Installation of oil stop and gate valves inside oil containment trench. 9. Miscellaneous lay out, grading, hauling, demolition, safety meetings and coordination and other appurtenant work. 10. Clean up and miscellaneous work. The projects provide for the construction of an oil containment system in the Pasadena Wilson and Oak Knoll Substations that will prevent any mineral oil spills from transformers and electrical equipment from affecting the environment. Federal Environmental Protection Agency regulations require that potentially large oil spills be contained within the immediate area. The substations were constructed prior to these federal regulations. The projects will bring the substations up to code to comply with Title 40 (Protection of Environment), Code of Federal Regulations (CFR), Part 112 (Oil Pollution Prevention). The construction work includes sawcutting and removal of existing concrete pad; excavation, backfill, soil compaction, testing and shoring where required; installation of reinforced concrete pipe, reinforced concrete trench with grates, and reinforced concrete structures; hauling, providing safety devices, demolition, etc.; and cleanup and miscellaneous appurtenant work. Engineer's estimate will not be made available for these projects. City Personnel and contractors will meet at the first project site and then drive to the second project site. General questions regarding the projects will be addressed. Question Submission Deadline: November 2, 2023, 11:00am Questions regarding this solicitation should be submitted directly through the City's eProcurement Portal Q&A function. Do not contact any other City employee or official regarding this solicitation. Any questions submitted after the date and time specified may not be considered. LOCATION OF WORK WILSON SUBSTATION (PROJECT #1): The project site is inside the Wilson Substation located at 920 N. Wilson Avenue, Pasadena, California, 91104. OAK KNOLL SUBSTATION (PROJECT #2): The project site is inside the Oak Knoll Substation located at 525 S. Oak Knoll Avenue, Pasadena, California 91101. The CONTRACTOR shall begin work within fifteen (15) calendar days after date of the Notice to Proceed and shall diligently prosecute the work to completion in every detail, within 45 Working Days for Wilson Substation (Project #1) and 45 Working Days for Oak Knoll Substation (Project #2) after the date in the Notice to Proceed with Work, exclusive of maintenance periods if any.

Award

Power Plant

$209,885.00

Public - City

Renovation

31

20

3

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
107
Bidding Soon
2,240
All Active Projects
1,000
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2023

December 22, 2023

img_map_placeholder

Multiple Locations, Pasadena, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.