BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Forrest City, Arkansas. Completed plans call for site work for a water / sewer project.

City of Forrest City, Arkansas Request for Proposals AMI/AMR Water Meter/control System Improvement Program Sealed bids (herein, the terms "bid(s)" and "proposal(s)" are used interchangeably and are considered to have the same meaning and components) for the AMI/AMR (Advanced Metering Infrastructure/Automatic Meter Reading) Water Meter/Control System Improvement (AMI/AMR System) Program for the City of Forrest City, Arkansas (the City or City, with "the City" constituting both it, its selected agents, and any other parties or providers of its choosing). The City plans to improve its existing system of approximately 5,000 old and rebuilt meters, its controls, and other supporting infrastructure. The current system's accuracy and reliability no longer fall within acceptable industry standard ranges, qualifying the City for ARPA grant funds via a USDA/NRCS program, to replace its water meters, control system, and other system elements/infrastructure, with an AMI/AMR System, which, upon successful installation, will aid the City in making informed operating/maintenance decisions, by curbing water wastage, and providing other automation, communication/alert, monitoring, reliability, savings, etc. benefits for customers and the City. Subject meter, radio, reading equipment and software specifications are to be designed to establish minimum guidelines for selecting an/this extremely critical metering system. Areas of concern to be evaluated in the selection process include, but are not limited to ease of installation, operational features and benefits, readability, future system maintenance expense, and future system expandability. A design, which reflects longevity of proper operation in all elements and high degree of sustained accuracy within the entire range of the meter assembly, is mandatory. Enhanced accuracy levels and performance are required and will not be compromised. The deadline for all Proposer inquiries is 2PM, Friday, December 22 nd , 2023

Award

Water / Sewer

$517,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
21
Bidding Soon
375
All Active Projects
148
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2024

February 9, 2024

img_map_placeholder

Multiple Locations, Forrest City, AR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.