Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a residential development in Forrest City, Arkansas. Completed plans call for the renovation of a residential development.
2022 CFP Kitchen Renovations, Electrical Lighting Replacement, Stair Ceiling, Siding Construction. NOTE: Contractor must bid on project in order to have deposit returned. Such deposit will be refunded to each person upon submission of a bona fide bid and who returns the bidding documents in good condition within ten(10) days after the bid opening except for the successful bidder. Sub-Contractors must obtain information and specifications from the General Contractor or Online. That if awarded the Contract, the Bidder hereby agrees to fully complete the contract within 400 consecutive calendar days after the date of the Notice to Proceed and should he fail to fully complete the work within the above stated time, he shall pay the PHA as fixed, agreed and liquidated damages and not as a penalty, the sum of $ 300.00 for each calendar day of delay until the work is completed and accepted ALL BID DEPOSIT CHECKSOR DRAFTS SHALL BE MADE PAYABLE TO RODNEY L. GAREY,ARCHITECT, PLLC Bid packets may be mailed provided bidder advances a cashier's check or money order in the amount of$35.00 per set for shipping and handling if they do not have an account with a package shipping company. All bids must be submitted on forms furnished by the PHA, submitted in duplicate and submitted in a sealed envelope plainly marked to show the name and address of the bidder, contract job number, and date and time of bid opening. Bidders are required to have an Arkansas Contractor's License. This is in accordance with Arkansas State Statute 71-701 et. seq. Each bid submitted must contain the following items. 1. Bid form, signed by bidder; 2. A bid Guarantee in an amount equal to (5) percent of the bid. The Bid Guarantee can be in the form of a certified check or cashier's check made payable to the PHA; or a satisfactory bid bond executed by the bidder; 3. A Non-Collusive Affidavit; if over $50,000.00 4. A Previous Participation Certification, HUD-2530 The successful bidder shall be required to furnish an Arkansas Performance and Payment Bond or Bonds in the amount of 100percent of the Contract Bid for contracts that exceed $20,000.00. The PHA reserves the right to reject any or all bids or to waive any informalities in the bidding. No bid shall be withdrawn for a period of forty-five (45) days subsequent to the opening of bids without the consent of the PHA.
Award
Residential Subdivision
$1,062,890.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2024
June 5, 2024
To Be Determined, Forrest City, AR
Related To This Project
Forrest City, AR
Bid Date: Jun 13 2024
Forrest City, AR
--
Forrest City, AR
Bid Date: Jun 24 2024
Forrest City, AR
--
Forrest City, AR
Bid Date: Oct 21 2024
Forrest City, AR
Bid Date: Oct 15 2024
Forrest City, AR
Bid Date: Oct 15 2024
Forrest City, AR
Bid Date: Nov 06 2024
Forrest City, AR
Bid Date: Mar 07 2024
Forrest City, AR
Bid Date: Mar 26 2024
Forrest City, AR
Bid Date: Feb 28 2024
Forrest City, AR
Bid Date: Nov 18 2021
Forrest City, AR
Bid Date: Jan 09 2024
Forrest City, AR
--
Forrest City, AR
Bid Date: Mar 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.