Published February 16, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Andover, Massachusetts. Completed plans call for site work for a water / sewer project.

Project awarded to Cedrone Corp. in the amount of $1,431,152.50 Project includes replacement of approximately 130 lead services from the water main to 1-foot beyond the interior building foundation wall; connection to existing interior infrastructure; installation of new corporation stops with service saddles where applicable, new copper tubing, new curb stops, and appurtenances on both public and private property; complete restoration of public and private property to pre-construction conditions. Each bid must be accompanied by a bid security of CASH, CERTIFIED CHECK, or BID BOND issued by a responsible bank or trust company licensed to do business in the State of Massachusetts in the amount of 5% of the total bid. Upon award, a bond of an amount equal to 100 percent of the total amount of the bid with a surety company satisfactory to the Town, as surety, will be required for the faithful Performance of the contract and the Payment for all labor and materials used in the work. Such bonds shall be prepared on forms provided by the Owner and supplied by a surety company licensed to do business in the Commonwealth of Massachusetts. Attention is directed to the minimum wage rates to be paid as determined by the Department of Labor and Workforce Development under the provisions of Massachusetts General Laws, Chapter 149, and Sections 26 to 27 D inclusive. Federal Minimum Wage Rates as determined by the United States Department of Labor and the Davis-Bacon Act also apply to this Project per SRF requirements. In case of discrepancy between state wage rates and Federal wage rates, if any, the higher wage rates shall apply. Disadvantaged Business Enterprise (DBE) goals are applicable to the total dollars paid under the resulting construction Contract. The goals for this Project are a minimum of 4.20 percent D/MBE participation and 4.50 percent D/WBE participation by certified DBEs. The two lowest responsive Bidders shall submit completed DBE forms (EEO-DEP-190C & EEO-DEP-191C and DBE Certification of United States Citizenship form) by close of business on the third business day after Bid opening. Failure to comply with these requirements may render a Bid non-responsive. No waiver of any provision of the D/MBE & D/WBE Requirements will be granted unless approved by the MassDEP. Questions will be received until October 19, 2023 at 5:00 p.m. The Contractor shall start the work under this Contract on written notice from and on date set by the Owner. The Contractor shall start the work on the date set by the Owner and shall continue, without interruption, to completion with all the practical dispatch and regularity. Work is to begin in or around December 1, 2023. Priority locations shall be substantially completed by September 16, 2024 and completed in full by October 15, 2024. All work to be completed during normal business hours of 7:00 AM to 5:00 PM. All work to be done with minimal to no impact to office and administrative operations being held. Liquidated damages in the amount of $500.00 per day shall be enforced for every day that the project is not complete past the date of substantial completion and final acceptance. Andover is an affirmative action/equal opportunity purchaser. The Town reserves the right to accept or reject, in whole or in part, any or all bids or take whatever, other action may be deemed necessary to be in the best interest of the Town.

Award

Water / Sewer

$1,431,153.00

Public - City

Site Work

4

16

7

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Project Utility Sources, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Warranties, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Water Repellents, Thermal Protection
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Wall and Door Protection
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Educational and Scientific Equipment, Laboratory Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furniture, Seating, Chairs, Residential Furniture, Beds
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geotechnical Instrumentation and Monitoring of Earthwork, Special Foundation and Load Bearing Elements Instrumentation and Monitoring, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Excavation Support and Protection
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Service Connections
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
384
Active Projects
212
Bidding Soon
2,892
All Active Projects
1,343
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2023

December 1, 2023

img_map_placeholder

Multiple Locations, Andover, MA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Lead Service Line Replacements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.