BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Thomaston, Georgia. Completed plans call for site work for a bridge / tunnel.

Upson County Board of Commissioners Request for Quotes (RFQ) Replacement of Elevated Footbridge Located on The Natural Dam Trail @ Upson Countys Sprewell Bluff Park Thomaston, Georgia The Upson County Board of Commissioners (referred to as the Board) is inviting quotations for the reconstruction of an elevated footbridge situated approximately one mile within the serene woods along The Natural Dam Trail, at Upson County's Sprewell Bluff Park. The previous elevated footbridge, located deep within the serene woods, was tragically destroyed, and carried away by woodwaters. The project involves designing, constructing, and replacing an elevated footbridge within a wooded area, with the aim of serving both UTVs and pedestrians. The Upson County Board of Commissioners (referred to as "the Board") is inviting quotations for the reconstruction of an elevated footbridge situated approximately one mile within the serene woods along The Natural Dam Trail, at Upson County's Sprewell Bluff Park. The previous elevated footbridge, located deep within the serene woods, was tragically destroyed, and carried away by floodwaters. The project involves designing, constructing, and replacing an elevated footbridge within a wooded area, with the aim of serving both UTVs and pedestrians. Contractors interested in this endeavor are required to arrange a site visit with Sarah Williams, Sprewell Bluff Park Director. During this visit, a thorough site survey must be conducted to assess the terrain conditions and establish the project's specific requirements. For further details and document requirements, please contact Allen Salter - at asalter@upsoncountyga.org. All interested contractors must provide a valid Certificate of Insurance in accordance with the guidelines outlined in the quote package. Please note that any interested contractor must provide a valid Certificate of Insurance according to the instructions in the quote package. For technical inquiries, and to set up a time to assess the site, please contact: Sarah Williams Sprewell Bluff Park Director 675-544-1981 or 706-741-0041

Post-Bid

Bridges / Tunnels

$150,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
40
Bidding Soon
1,147
All Active Projects
437
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2023

November 20, 2023

img_map_placeholder

700 Sprewell Bluff Rd, Thomaston, GA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.