BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Thomaston, Georgia. Completed plans call for the renovation of a clubhouse / community center.

Question Deadline 11/16/2023 at 2:00 PM ET Invitation to bid for commercial roof replacement for the Upson County Senior Center. A. Scope: 1. Roof System Flashing Conditions: In roof system work areas included in project, install new sealants in accordance with project summary of work, project technical specifications, project diagrams, and applicable manufacturerrequirements. 2.03 NON-SAG JOINT SEALANTS A. Sealant Type 1 - Non-Staining Silicone Sealant: ASTM C920, Grade NS, Uses M and A; not expected to withstand continuous water immersion or traffic. 1. For use on metal, concrete, stone, glass and other manufacturer approved substrates. Not for use in contact with roof membranes. 2. Movement Capability: Plus and minus 50 percent, minimum. 3. Non-Staining to Porous Stone: Non-staining to light-colored natural stone when tested in accordance with ASTM C1248. 4. Dirt Pick-Up: Reduced dirt pick-up compared to other silicone sealants. 5. Hardness Range: 15 to 35, Shore A, when tested in accordance with ASTMC661. 6. Color: To be selected by Consultant from manufacturer's standard range. 7. Cure Type: Single-component, neutral moisture curing. 8. Service Temperature Range: Minus 65 to 180 degrees F (Minus 54 to 82 degreesC). 9. Products: Basis of Design is products manufactured by Dow Corning Corporation. A. Perform work in accordance with sealant manufacturer's requirements for preparation of surfaces and material installation instructions. B. Utilize tape to provide a perimeter boundary for joint sealant installation. Ensure tape used does not damage or alter the appearance of substrates that tape is installedover. C. Measure joint dimensions and size joint backers to achieve width-to-depth ratio, neck dimension, and surface bond area as recommended by manufacturer, except where specific dimensions are indicated. 1. Install joint sealant backing materials (i.e., backer rod, etc.) at joints greater than 1/8- inch in width and depth. Coordinate with sealant manufacturerrequirements. 2. Install bond breaker backing tape where backer rod cannot be used. D. Install sealant free of air pockets, foreign embedded matter, ridges, and sags, and without getting sealant on adjacent surfaces. E. Do not install sealant when ambient temperature is outside manufacturer's recommended temperature range or will be outside that range during the entire curing period, unless manufacturer's approval is obtained, and instructions are followed. F. Non-sag Sealants: Tool surface concave, unless otherwise indicated; remove joint sealant boundary masking tape immediately after tooling sealantsurface. 3.04 FIELD QUALITY CONTROL A. Non-Destructive Adhesion Testing: If there are any failures, notify Consultant and Owner immediately. B. Remove and replace failed portions of sealants using same materials and procedures as indicated for original installation

Post-Bid

Clubhouse / Community Centers

$150,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
40
Bidding Soon
1,147
All Active Projects
437
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2023

December 22, 2023

img_map_placeholder

302 S Bethel St, Thomaston, GA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.