BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Half Moon Bay, California. Completed plans call for site work for a water / sewer project.

This Public Works Contract consists of construction of Owner's Myrtle St and 2nd Ave Valve Replacement Project located in the City of Half Moon Bay, California, 94019 within the City of Half Moon Bay. Work includes, without limitation Installation of approximately 60 linear ft of 6-inch ductile iron pipe (DIP) water main, as shown on the Contract Drawings. Replacement of eleven (11) 6-inch gate valves, as shown on the Contract Drawings. Installation of three (3) 6-inch gate valves, as shown on the Contract Drawings. Installation of water service lines and reconnection to existing water services, as shown on the Contract Drawings. Installation of two (2) fire hydrant assembly, as shown on the Contract Drawings. Abandonment of existing water facilities, as shown on the Contract Drawings. Connection of the new water mains to the existing 6-inch DIP water lines, as shown on the Contract Drawings. Each bid must be accompanied by a certified or cashier's check or by a corporate surety bond on the form furnished by the District as a guaranty that the bidder, will, if an award is made to him in accordance with the terms of his bid, promptly secure worker's compensation and employer's liability insurance, public liability insurance, and execute a contract in the required form; and furnish satisfactory performance and payment bonds. Said check or bidder's bond shall be in an amount not less than 10 percent of the amount of his bid. Pursuant to Public Contract Code Section 22300, the successful bidder shall be entitled to submit securities in lieu of the retention of progress payments The Engineer's estimate of the construction cost is $231,605 The District reserves the right at its sole discretion after opening bids to waive any and all irregularities in any bid, and to make award to the lowest responsible bidder, and to reject any and all bids.

Bid Results

Water / Sewer

$199,910.00

Public - County

Site Work

11

14

8

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
79
Bidding Soon
1,578
All Active Projects
686
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2023

November 27, 2023

img_map_placeholder

Multiple Locations, Half Moon Bay, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.