BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2025 at 8:00 PM

Updated July 16, 2025

Renovation of a military facility in Eielson AFB, Alaska. Conceptual plans call for the renovation of a military facility.

The 354th Eielson Contracting Quadron is seeking qualification packages for A&E services for the project below: The Arctic Utilidor D & Arctic Utilidor H were ed and installed in the 1950's and have exceeded their useful life. Many of the pipes have patches and splices to keep them operational and pipe supports have rusted. In addition, it is suspected there is significant infiltration and inflow (I&I) entering the system through the utilidor infrastructure due to aging waterproofing and concrete joint sealing systems. This is causing the wastewater treatment plant to encroach on its permitted treatment volume during spring break up. Based on previous utilidor projects, it is suspected there will be asbestos-containing material (ACM), but a hazmat survey shall be conducted for both utilities to determine what hazardous materials are present. Both utilidors fall within contaminated soils areas. Utilidor D will need the Design of the full-length replacement of all utility systems, this includes sewer, water, steam, and condensate utility piping in the main utilidor. All lateral lines servicing the Butler Buildings 3435-3442 and Building 3426 shall also be replaced. The existing service to Building 3425 shall remain in place and be connected to the new utility lines. Utilidor H will also need the full-length design of the replacement of all utility systems, all lateral lines servicing the buildings shall be replaced. Also design three additional manholes for Utilidor H to provide a maximum of 300-feet spacing between drip legs and traps. The contract schedule set forth in the statement of work requires a delivery of 100 design documents in 216 calendar days. If this is something your firm is interested in and can accomplish, please submit a combined Instructions to Offers (Evaluation Factors Document), SF330 (Architect-Engineer Qualification-Standard Form 330), and a PPQ (Past Questionnaire). The Method of Contractor Selection has not been determined at this Time.

Conceptual

Military

$800,000.00

Public - Federal

Renovation

4

7

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
1
Bidding Soon
41
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2026

Project location map

To Be Determined, Eielson AFB, AK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.