Site work for a civil project in Plum Coulee, Manitoba. Completed plans call for site work for a road / highway.

* Award subject to final approval. The Work of This Tender No. X21176 is Generally Described Below: Section I Rural Municipality of Winkler, Intersection of Provincial Trunk Highway (Pth) 14 and Pth 32 With Provincial Road (Pr) 428. Installing Traffic Signals Plant, Which Includes Underground Electrical Conduits, Pull Pits, and Redirecting Conduit in Existing Foundations. Pulling in Cable, Mounting Wavetronix Detection Hardware, Field Wiring of Detection Cable, Installation of New Median 2.5m Light Series Davits Complete With Heads, and Installation of Heads on Existing 5m Light Series Davits, and Wiring Field Cables at the Intersection, Programming and Cabinet Wiring of New Wavetronix Detection Will Be Completed by Manitoba Transportation and Infrastructure, Traffic Engineering Staff. Section II Rural Municipality of Winkler, Intersections of Main Street at Stanley Ave Installation of New Pedestrian Corridor Plant at the Intersection, Which Includes Concrete Bases, Underground Electrical Conduits and Demolition of Old Bases (Once Corridor Has Been Transitioned Over to New Corridor by Manitoba Transportation and Infrastructure Installation of New Poles, Corridor Heads, Pushbuttons, Pxo and Disposal of Old Poles and Corridor Heads Will Be Completed by Manitoba Transportation and Infrastructure. Completion Model The Contract Will Be Assessed Liquidated Damages in Accordance With the Specification for Liquidated Damages - Completion Specified by Completion Date. Completion Dates and Liquidated Damages Subcompletion Construction of All Work in Section I is to Be Completed by No Later Than November 24, 2023. The Contractor Shall Ensure All Necessary Work is Completed to Accommodate This Date. Daily Liquidated Damages After This Specified Completion Date Will Be Charged to the Contractor at the Rate of Five Hundred ($500.00) Dollars Per Calendar Day Until the Work is Completed. Completion All Remaining Work Shall Be Completed by July 31, 2024. The Contractor Shall Ensure All Necessary Work is Completed to Accommodate This Date. Daily Liquidated Damages After This Specified Completion Date Will Be Charged to the Contractor at the Rate of Five Hundred ($500.00) Dollars Per Calendar Day Until the Work is Completed. Seasonal Shutdown The Seasonal Shutdown Date for This Project is: N/a Question Acceptance Deadline: 2023/10/17 12:00:00 PM CDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Roads / Highways

$64,780.00

Public - State/Provincial

Site Work

6

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
2
Bidding Soon
338
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2023

November 1, 2023

Project location map

MB-32 & MB-14, Plum Coulee, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.