Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Plum Coulee, Manitoba. Completed plans call for site work for a road / highway.
* Award subject to final approval. The Work of This Tender No. X21176 is Generally Described Below: Section I Rural Municipality of Winkler, Intersection of Provincial Trunk Highway (Pth) 14 and Pth 32 With Provincial Road (Pr) 428. Installing Traffic Signals Plant, Which Includes Underground Electrical Conduits, Pull Pits, and Redirecting Conduit in Existing Foundations. Pulling in Cable, Mounting Wavetronix Detection Hardware, Field Wiring of Detection Cable, Installation of New Median 2.5m Light Series Davits Complete With Heads, and Installation of Heads on Existing 5m Light Series Davits, and Wiring Field Cables at the Intersection, Programming and Cabinet Wiring of New Wavetronix Detection Will Be Completed by Manitoba Transportation and Infrastructure, Traffic Engineering Staff. Section II Rural Municipality of Winkler, Intersections of Main Street at Stanley Ave Installation of New Pedestrian Corridor Plant at the Intersection, Which Includes Concrete Bases, Underground Electrical Conduits and Demolition of Old Bases (Once Corridor Has Been Transitioned Over to New Corridor by Manitoba Transportation and Infrastructure Installation of New Poles, Corridor Heads, Pushbuttons, Pxo and Disposal of Old Poles and Corridor Heads Will Be Completed by Manitoba Transportation and Infrastructure. Completion Model The Contract Will Be Assessed Liquidated Damages in Accordance With the Specification for Liquidated Damages - Completion Specified by Completion Date. Completion Dates and Liquidated Damages Subcompletion Construction of All Work in Section I is to Be Completed by No Later Than November 24, 2023. The Contractor Shall Ensure All Necessary Work is Completed to Accommodate This Date. Daily Liquidated Damages After This Specified Completion Date Will Be Charged to the Contractor at the Rate of Five Hundred ($500.00) Dollars Per Calendar Day Until the Work is Completed. Completion All Remaining Work Shall Be Completed by July 31, 2024. The Contractor Shall Ensure All Necessary Work is Completed to Accommodate This Date. Daily Liquidated Damages After This Specified Completion Date Will Be Charged to the Contractor at the Rate of Five Hundred ($500.00) Dollars Per Calendar Day Until the Work is Completed. Seasonal Shutdown The Seasonal Shutdown Date for This Project is: N/a Question Acceptance Deadline: 2023/10/17 12:00:00 PM CDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Award
Roads / Highways
$64,780.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better bids. Win.
The best source for commercial construction data, period. Get instant access to up to five free projects and companies. Subscribe all contacts, documents, and details so that you can find new opportunities and win new business.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
October 19, 2023
November 1, 2023
July 31, 2024
MB-32 & MB-14, Plum Coulee, MB
Related To This Project
Plum Coulee, MB
Bid Date: Apr 04 2024
Plum Coulee, MB
Bid Date: Sep 06 2024
Plum Coulee, MB
--
Plum Coulee, MB
Bid Date: Oct 05 2023
Plum Coulee, MB
Bid Date: Mar 31 2022
Plum Coulee, MB
Bid Date: Sep 22 2023
Plum Coulee, MB
Bid Date: Jul 29 2022
Plum Coulee, MB
Bid Date: Dec 20 2019
Plum Coulee, MB
Bid Date: Dec 06 2022
Winnipeg, MB
Bid Date: Oct 10 2023
Swan River, MB
Bid Date: Oct 31 2023
Brandon, MB
Bid Date: Oct 20 2023
Nelson House, MB
Bid Date: Nov 03 2023
Ashern, MB
Bid Date: Oct 13 2023
Winnipeg, MB
Bid Date: Oct 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--