BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a playground / park / athletic field in Palm Beach Gardens, Florida. Completed plans call for site work for a playground / park / athletic field.

This project's work involves, at a minimum, the following requirements: A. Removal and disposal of existing turfgrass based on the square footage and area shown in Exhibit A. i. The use of a KORO fraise mower, or equivalent, is required for the removal of the turfgrass. ii. The City will provide the irrigation services for this phase of the work. B. Distribute 90/10 rootzone mix evenly on the field using dimensions provided in Exhibits B, C, and D. i. 90/10 rootzone mix, estimated at 500 tons per acre, will be provided by the City. C. Roto-till soil to blend 90/10 rootzone mix into existing soil. i. The use of a Rotadairon tiller, or equivalent, to incorporate the soil, is required for this phase of the work. D. Laser-grade 90/10 rootzone mix to proper slope and grade. i. A dual-mast laser level kit is required for this phase of the work. ii. The slope shall be 0.5% in the infield crown from the pitcher's mount outwards. The slope in the outfield shall be crowned from the back infield arc and middle of the outfield towards the warning tracks. The City will specify the exact design on the site. E. Furnish and install certified Celebration Hybrid Bermudagrass based on the square footage and designs shown in Exhibits B, C, and D. i. The sod vendor must be approved by the City. ii. The use of a KWMI dual track sod laying machine, or equivalent, is required for this phase of the work. F. Roll turfgrass to finish. Renovation of Baseball Field at Lilac Park All Contractors Are Advised to Carefully Examine the Requirements of This Invitation to Bid. Any Questions Regarding the Completeness or Substance of the Requirements Shall Be submitted in Writing via the E-procurement Platform. The City of Palm Beach Gardens Reserves the Right to Accept or Reject Any or All Bids, in Whole or in Part, With or Without Cause, to Waive Any Irregularities and/or Technicalities, and to Award the Contract on Such Terms and Conditions It Deems Will Best Serve the Interests of the City. Pre-bid Meeting: Site Visit on October 13.

Post-Bid

Playgrounds / Parks / Athletic Fields

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
57
Bidding Soon
1,071
All Active Projects
453
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2023

November 20, 2023

img_map_placeholder

4175 Lilac St, Palm Beach Gardens, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.