Published December 13, 2023 at 7:00 PM

Updated October 1, 2024

New construction and renovation of a detention facility in Eagle Bend, Minnesota. Completed plans call for the renovation of a detention facility; and for the construction of a detention facility.

Todd-Wadena Community Corrections Site Directions: Todd-Wadena Community Corrections 230 Main Street East Eagle Bend, MN 56446 Est. Completion Date: Sept. 1, 2024 New single story wood framed building for the Todd-Wadena Corrections Department. SCOPE: Mechanical Contractor shall perform all excavation required for his work. 2 EXCAVATION: Contractor shall do all excavation required to install pipe to depth shown on plans. The bottom of all trenches shall be accurately graded to provide uniform bearing and support for each section of the pipe on undisturbed soil at every point along its entire length, except for "bell holes" which shall be dug after the trench bottom has been graded. Excess excavation below the required level shall be backfilled with washed sand and thoroughly tamped. Contractor shall remove by pumping, or other means, any water which has accumulated in the excavation. Contractor shall do all shoring and bracing necessary to perform his work and required by safety. Temporary bridges shall be built by Contractor where required to maintain traffic. Refer to soil boring tests for dewatering. Refer to architectural specifications for other special requirements. Installation of underground plastic pipe shall comply with ASTM D2321.

Award

Jails / Prisons

$853,785.00

Public - State/Provincial

New Construction, Renovation

63

36

19

6

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer Qualifications, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Acceptance of Conditions, Field Engineering, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Siding
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Ceilings, Painting and Coating, Staining and Transparent Finishing, Interior Finishing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Toilet, Bath, and Laundry Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Central Heating Equipment, Furnaces, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
23
Bidding Soon
222
All Active Projects
97
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2023

November 27, 2023

img_map_placeholder

230 Main St E, Eagle Bend, MN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Todd-Wadena Community Corrections

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.