BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2023 at 7:00 PM

Updated January 27, 2024

Site work and paving for a mixed-use development in Wapato, Washington. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Donald Wapato Conveyance Improvement Project Site Directions: The project site is the mid- Yakima River Island located adjacent to the Donald-Wapato (Road) Bridge west of Interstate-82. Directions to the project site: - From I-82 E toward Richland, take Exist 44 toward Wapato. Then, turn right onto Donald Wapato Rd., the mid- river island will be on the right of the Donald-Wapato (Road) Bridge - From I-82 W toward Yakima, take Exist 44 toward Wapato, turn left onto Donald Wapato Rd., the mid- river island will be on the right of the Donald-Wapato (Road) Bridge Est. Value: $ 300,000.00 Est. Value Notes: Engineers Estimate This Contract provides for the improvement of the conveyance along the Donald Wapato reach of the Lower Yakima River, by constructing approximately 960 linear feet of floodplain channels and removing various types of existing artificial materials from the area. Work includes clearing and grubbing, channel and abandoned ramp excavation including haul, berm, and spoil pile construction, and other work, all in accordance with the attached Contract Plans, these Contract Provisions and Standard Specifications. The work is funded by grant funding from the Washington State Department of Ecology through the Yakima Basin Integrated Planning Grant.

Award

Water / Sewer

$305,946.00

Public - County

Paving, Site Work

11

10

6

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
23
Bidding Soon
403
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2023

November 24, 2023

Project location map

Donald Rd, Wapato, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.