BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, outdoor lighting and new construction of a mixed-use development in St Petersburg, Florida. Working plans call for the construction of a stadium; for site work for a stadium; sidewalk / parking lot; for paving for a sidewalk / parking lot; and for outdoor lighting for a stadium.

Project scope includes but is not limited to site work, paving and construction of a new outdoor ballpark. As of July 29, 2024, a Construction Manager at Risk and a Design-Build firm have been selected. Project seeking approval from Pinellas County Board of Commissioners. Construction Manager at Risk is currently seeking subcontractor input for budgetary round of pricing. Anticipated designer assist bid package is anticipated to release by end of August 2024. Construction is anticipated for second quarter 2025. The New Ballpark will serve as the home to Rays baseball games and as an event venue and gathering space for other large events (concerts, sporting events, festivals) and community gatherings (graduations, meetings, youth sports). The New Ballpark will be located on 10 to 15 acres and is expected to comprise a footprint between 850,000 and 950,000 square feet. The New Ballpark will be an enclosed, covered, and conditioned building to ensure fan comfort and protection from the elements. It is anticipated that portions of the New Ballpark will remain open and accessible to the public on game days and non-game days alike. Building capacity for Rays games is expected to be around 30,000 fans, with a goal of providing the most intimate experience and exceptional sight lines in MLB. Preliminary program and concept design includes a variety of seating types across three levels including the lower bowl, mezzanine bowl, and upper bowl. A variety of seating types will include premium clubs and suites, traditional and modern general seating, and flexible viewing areas, decks, and social gathering spaces for all fans. Much like the innovative approach utilized in the team's front office operations, the Rays' approach to designing and constructing the New Ballpark will be headlined by innovation, creativity, boldness, and connectivity. The team's objective in designing and constructing the New Ballpark is to create a baseball and entertainment experience like none other, in a facility that brings together the entire Tampa Bay community. The New Ballpark will offer a variety of family-friendly amenities, social spaces, and viewing areas providing for a seamless transition between the stadium experience and game action.

Pre-Construction/Negotiated

Arenas / Stadiums

$1,300,000,000.00

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

92 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
131
Bidding Soon
2,329
All Active Projects
930
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 22, 2024

April 7, 2025

January 2, 2028

img_map_placeholder

To Be Determined, St Petersburg, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.