BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated August 1, 2025

Renovation of an educational facility in Dawson Creek, British Columbia. Completed plans call for the renovation of a educational facility.

Replacement of one (1) gas-fired rooftop air handling unit at the Dawson Creek campus of Northern Lights College with ALTERNATIVE prices for replacement of two additional units (RTU-2, RTU-3) Equipment has been pre-ordered by the Owner, contractor is responsible for demolition, installation, start-up, warranty. Controls services to be retained directly by the College (Webir Automation). 1 MECHANICAL .1 Provide new, complete, operational, and tested mechanical systems for heating, ventilation, air conditioning, and controls, as described herein, indicated on the drawings and in full conformance with applicable codes, standards and ordinances. .2 Provide all labour, materials and products as specified, as required to accomplish this work. .3 The scope of HVAC work for this project generally includes: .1 Demolition of existing rooftop air handling units .2 Installation of new rooftop air handling units .3 Supply and installation of ductwork and piping insulation .4 Balancing, commissioning, and testing .5 Verification of systems operations and controls .6 Owner Training .7 Demonstration to Consultant .4 Plumbing work will include the following: 1. Disconnection of existing natural gas to existing rooftop units to be replaced 2. Provision of new gas piping, valves and components to connect new gas services to new rooftop units 3. Installation of condensate drainage system for condensing appliances .5 Fire Protection work will include the following: 1. No scope. .6 Mechanical Demolition will include the following: 1. Removal of existing rooftop units 2. Removal of existing curbs .2 ROOFING .1 Roofing for new mechanical equipment including removal and replacement of roofing materials to accommodate new rooftop units 4 CONTROLS .1 Controls work shall be retained directly by the College. .2 The Contractor shall allow for coordination with the controls contractor as required for successful completion of the project including demolition, new controls installation, start-up, etc. .5 ELECTRICAL .1 Electrical work for connection of new rooftop units to existing electrical services. .2 Provision of new electrical circuits as required per the scope of work

Post-Bid

Educational

$100,000.00

Public - State/Provincial

Renovation

8

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
7
Bidding Soon
50
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2025

September 1, 2025

Project location map

11401 8th St, Dawson Creek, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.