BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Watsonville, California. Conceptual plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Reference Number 0000332512 The City of Watsonville was awarded a grant to enhance Green Infrastructure (GI) features for the new facility replacing the Nature Center currently under development at Ramsay Park. For 18 years, the Nature Center has delivered vital hands-on, outdoor environmental education and youth engagement from a humble prefab which limited its programming. Phase III of the Ramsay Park redevelopment will erect a new building designed to provide a fit-for-multi-purpose facility to serve as not just an education center for school field trips, but also as a hub for trail users to learn about the natural environment they are experiencing, a community classroom for adult learning and conservation programs, and a welcoming open space fit for a variety of new exhibits and pop-up programs. The GI features of Phase IV will make the new Nature Center a flagship for sustainable design and support the Center's educational content with its ability to impact visitors through on-site demonstrations for water conservation and low impact solutions in buildings and landscaping. A tree-lined, permeable, ADA accessible, multi-sensory switchback path connecting the building and lower parking lot. The path will enhance accessibility while also serving as an outdoor exhibit extension of the new Nature Center, providing a functional, inclusive entrance demonstrating natural bank stabilization and cooling. Tree and plant selection will prioritize species that: -Are California natives -Are drought-tolerant -Support bank-stabilization and erosion control. -Green roof landscaping (the roof's structure itself is scoped into Phase III) and Bio-swale design enhancing benefits from stormwater postconstruction control requirement (PCR) levels 2 to 3. A PCR 2 design is scoped into Ramsay Park Phase III Exploration Center; the scope of Phase IV Green Infrastructure will build on this for an enhanced PCR 3 design. Job Location 30 Harkins Slough Road Question Acceptance Deadline 10/25/2023 at 4:00 PM PT Questions are submitted online No General Requirements - Certification/Training - Contractors License Required - Insurance Required - License Required - Prevailing Wage Required

Conceptual

Playgrounds / Parks / Athletic Fields

Public - City

New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
67
Bidding Soon
1,319
All Active Projects
554
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 11, 2024

img_map_placeholder

30 Harkins Slough Rd, Watsonville, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.