BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 6, 2023 at 7:00 PM

Updated August 2, 2024

Site work and paving for a civil project in Bonifay, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

The Improvements Under This District Contract Consist of Milling and Resurfacing Sr 10 (Us 90) From East of Holmes Creek Bridge To Sr 277 in Washington County Under Fpid 445755-1-52-01. Other Improvements Under This Project Include Minor Drainage Improvements, Signing and Pavement Marking, Replacement of Traffic Monitoring Sensors and Loops, and Expansion Joint Replacement at the End Bents of Existing Bridge No. 610002. Pre-qualification is Required to Bid on This Project Counties: Washington Road Name: SR 10 (Us90) From Holmes Creek Bridge to SR 277 - Resurfacing Limits: 61010000 Project(s): 44575515201(*) Federal Aid No: N/A Total Roadway Length: 2.661 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 2.661 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Day Standard Contract Days: 120 For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FLDOT - Call Order: 004 - Resurfacing - SR 10 Question Deadline 11/02/2023 at 5:00 PM CT If You Have Any Technical Questions, You Must Go Through Our Bid Question & Answer Site. Question Posted to This Site on the Seventh Calender Days Prior to the Bid Opening Will Be Responded to by the Department. Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on Electronically.

Award

Roads / Highways

$2,175,239.00

Public - State/Provincial

Paving, Site Work

67

5

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
18
Bidding Soon
558
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2023

January 8, 2024

Project location map

FL-10, Bonifay, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.