BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a playground / park / athletic field in Gatlinburg, Tennessee. Completed plans call for the renovation of a 660-square-foot playground / park / athletic field; and for site work for a playground / park / athletic field.

The City of Gatlinburg reserves the right to waive any informalities in or to accept or reject any and/or all bids and to accept the bid deemed most favorable to the interest of the City. For questions concerning the Bid Documents, Bidders may contact City of Gatlinburg, Delea Patterson, AP/Purchasing, 1230 Parkway East, Suite 2, P.O. Box 5, Gatlinburg, Tennessee 37738 at 865-436-1409 or deleap@gatlinburgtn.gov. SUMMARY As part of the Mynatt Park Baseball/Softball field project the City of Gatlinburg requires the construction of two dugouts. The first base dugout 30' x 10' and the third base dugout being 36' x 10' due to the additional score box area. The scope includes the concrete slab and footer, galvanized steel tubes set in concrete, framing and roof system. BID SPECIFICATIONS Heavy rough sawn timber framing using Douglas Fir - please note any deviations/substitutions, posts in 1/4 " galvanized steel tubes set in concrete foundations. o Alternate #2: Treated Pine wrapped in painted concrete board, color TBD. 29 Gauge screw down metal roof o Alternate #1: Standing seam metal roof. 3000 psi 4" Concrete slab with typical broom finish and 2'- 3' dugout foundation. Notch top of 10" x 10" posts to accept 3x8 rafters Steel tubes should extend a minimum of 12 inches above finish concrete level and attach above concrete finish level. The steel tube should extend 24 inches below the finish concrete level into the foundation, with at least 3 inches of concrete below the bottom of the steel tube. A steel dowel in bottom center of tube to eliminate possible bottom movement is All bolts/lags should be rated grade 5 or higher.

Bid Results

Playgrounds / Parks / Athletic Fields

$108,046.00

Public - City

Renovation, Site Work

3

3

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
29
Bidding Soon
616
All Active Projects
293
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2023

November 20, 2023

img_map_placeholder

622 Historic Nature Trail, Gatlinburg, TN

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.