BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 26, 2023 at 7:00 PM

Updated March 16, 2024

Site work for a water / sewer project in Beaverton, Oregon. Completed plans call for site work for a water / sewer project.

Sexton Mountain Pump Station: The Sexton Mountain pump station is the City's primary pump station and the only one capable of lifting water to the Cooper Mountain reservoir. The upgrades are needed to increase the capacity, reliability, effectiveness, and efficiency of the pump station. Phase 1 of the SMPS Upgrade has been completed and included two 250 horsepower (HP) pumps and associated variable frequency drives (VFDs), retaining wall replacement, fence expansion, emergency standby generator and automatic transfer switch (ATS), two electric switchboards, transformer vault, and associated electrical improvements. Phase 2 will include upgrades to the existing pump station, a new seismically resilient pump station with a restroom, two booster pumps, a hydropower turbine, electric vehicle chargers, and architectural, structural, fencing, electrical, sanitary, and water line improvements. The project is included in the city's 2023-2024 Capital Improvement Program (CIP), As of December 26, 2023, a design team and general contractor are identified. Design was completed in March 2022. Construction is May 2021-Summer 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Under Construction

Water / Sewer

$4,830,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
87
Bidding Soon
1,068
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2021

Project location map

Multiple Locations, Beaverton, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.