BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a civil project in Orange, California. Completed plans call for site work for a road / highway; and for the demolition of a road / highway.

***As of October 25, 2023. Project has not been awarded yet. A timeline for award has not been established yet. The Project consists of tree removal, weed overgrowth removal, shipping container removal, signage demolition, graffiti removal, docking bay drainage improvements, fence repairs and installation, and general site clearing for Rancho Santiago Community College District, in compliance with the Contract Documents and Code requirements. The furnishing of all labor, materials, equipment, services, and incidentals necessary for Work of BR SAC Drinking Fountain Repairs and Replacement, 1530 W. 17th Street, Santa Ana, California 92869. The District reserves the right to place and install equipment in areas of the Project prior to Substantial Completion provided that it doesnt interfere with the completion of the Work. This partial occupancy shall not constitute acceptance of the Work by the District Representative. Contract Time. The Contract Time is 65 calendar days from date of Notice to Proceed to Final Completion. Failure to achieve the Contract Time will result in the assessment of Liquidated Damages as set forth in the Contract. The Bid and Contract Documents may be available from sources other than the Purchasing Webpage, including . The District is not responsible for the accuracy or completeness of Bid or Contract Documents obtained from any source other than the Purchasing Webpage. Bidders are solely responsible for the risk of inaccurate or incomplete Bid or Contract Documents obtained from any source other than the Purchasing Webpage. Bid Security. Each Bid Proposal shall be accompanied by Bid Security in an amount equal to Ten Percent (10%) of the maximum amount of the Bid Proposal, inclusive of any additive Alternate Bid Item(s). Failure of any Bid Proposal to be accompanied by Bid Security in the form and in the amount required shall render such Bid Proposal to be non-responsive and rejected by the District. Labor & Materials Payment Bond; Performance Bond. Prior to commencement of the Work, the Bidder awarded the Contract shall deliver to the District two 2 each of Labor & Material Payment Bond and a Performance Bond issued by a California Admitted Surety in the form and content included in the Contract Documents each of which shall be in a penal sum equal to One Hundred Percent (100%) of the Contract Price. No Withdrawal of Bid Proposals. Bid Proposals shall not be withdrawn by any Bidder for a period of 90 calendar days after the opening of Bid Proposals. During this time, all Bidders shall guarantee prices quoted in their respective Bid Proposals. Disabled Veteran Business Enterprises (DVBE) Participation Goal. Pursuant to Military & Veterans Code 999.2 and the Districts Board Policy, the District has established a Good Faith Participation Goal for DVBEs of Three Percent (3%) of the value of the Work. Pre-Bid Questions. All Bidder questions about the meaning or intent of the Contract Documents shall be directed to the District in writing by email to facilitiesbid@rsccd.edu (PreBid Questions) by utilizing the Districts Pre-Bid Clarification Form provided within. PreBid Questions and requests for clarifications must be submitted to the District by 5:00 P.M. October 22, 2023.

Bid Results

Roads / Highways

$100,700.00

Public - County

Demolition, Site Work

10

14

2

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
100
Bidding Soon
2,324
All Active Projects
1,097
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2023

November 13, 2023

img_map_placeholder

1465 N Batavia St, Orange, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.