BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Adrian, Michigan. Completed plans call for site work for a water / sewer project.

1. The City of Adrian Engineering Services and Public Works Departments will provide a list of catch basins to be lined. 2. Each catch basin is to be lined with at minimum Ultra-Thane 800 in order to seal the interior and provide structural support. 3. All lined catch basins shall be painted black 12-18 below the rim. 4. The contractor will have 60 days to complete the list. Contract will be effective upon signing of the Contract Agreement through June 30, 2026. The City shall have the right to renew the contract for one additional two-year period provided that forty-five days prior to the date of termination for the respective term of the contract, the City notifies the contractor of its intent to renew the contract. Any such extension shall be on the same terms and conditions as the original contract and pricing shall be the same as the last term of the contract. All bids to be F.O.B. Adrian, installed. All bids must be firm for not less than 60 days after official opening of bids. All bids must contain warranty information on the product being installed. The City of Adrian has a local preference policy The City of Adrian reserves the right to accept or reject any or all bids and to waive any irregularities. No contract shall be made with any person, firm or corporation in default of the city. Any questions may be directed to Matt Tomaszewski at (517) 264-4829 or at mtomaszewski@adrianmi.gov All bids must be submitted in a sealed envelope clearly marked on the outside, "Sealed Bid - Catch Basin Lining" Scope of Work 1. The City of Adrian Engineering Services and Public Works Departments will provide a list of catch basins to be lined. 2. Each catch basin is to be lined with at minimum Ultra-Thane 800 in order to seal the interior and provide structural support. 3. All lined catch basins shall be painted black 12-18" below the rim. 4. The contractor will have 60 days to complete the list. Specifications Please see the attached detail sheets for specifications.

Bid Results

Water / Sewer

$1,380.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
82
Bidding Soon
1,472
All Active Projects
595
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2023

December 4, 2023

img_map_placeholder

To Be Determined, Adrian, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.